BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a detention facility in Alton, Missouri. Completed plans call for the renovation of a 4,546-square-foot detention facility.

Proposals shall be labeled as follows: BID PROPOSAL: OREGON COUNTY JAIL ATTN: TRACY BRIDGES, COUNTY CLERK The Oregon County Commission is planning a renovation of the current third floor of the Oregon County Courthouse, located at 1 Court Sq, Alton, MO, renovation of the jail for the county. Generally, work in the existing 4,546+ sf third floor will include demolition of existing walls, finishes, electrical, & mechanical systems. Constructing new detention housing and renovating the existing detention housing, and institutional support areas. Constructing new plumbing and electrical, and other Work indicated in the Contract Documents. All addenda will be issued to all plan holders that have obtained their documents through the office of the architect. It is the bidder's responsibility to verify if any addenda have been issued. To be considered, bids must be made in accordance with the Instructions to Bidders included in the Project Manual. Each bidder must submit a Surety Bid Bond in the amount of (5%) five percent of their bid amount. The selected General Contractor will be required to furnish Performance and Payment Surety Bonds for the full amount of the Contract and shall include this cost in their bid. The Oregon County Commission is a Tax Exempt Agency. Sales tax shall not be included in any bid. All bids must be on a lump sum basis for each section of work; segregated bids will not be accepted. No bid may be withdrawn for a period of (60) sixty days after the bid date. The Owner will evaluate bids based on the best interest of the Owner and will award the project to the lowest and best qualified bidder. The Owner maintains the right to approve any and all subcontractors and reserves the right to waive irregularities and to reject any and all bids. Attention is called to the provision for equal employment opportunity and payment of not less than the minimum wages as set forth in the Bid Package. Davis-Bacon and Missouri Prevailing Wage Rates shall apply. The Oregon County Commission is an Equal Opportunity Employer.

Post-Bid

Jails / Prisons

$1,090,000.00

Public - County

Renovation

18

15

7

3

Subscribe For Documents

15 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
14
Active Projects
9
Bidding Soon
165
All Active Projects
52
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 21, 2024

January 20, 2025

img_map_placeholder

1 Court Sq, Alton, MO

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.