Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work, paving and new construction of a mixed-use development in New Smyrna Beach, Florida. Completed plans call for site work for a water / sewer project; sidewalk / parking lot; for paving for a sidewalk / parking lot; road / highway; road / highway; for the construction of a bridge / tunnel; bridge / tunnel; and bridge / tunnel.
Counties: Volusia Road Name: SR 9 (I-95) Limits: From Mp 18.355 to Mp 19.552c Project(s): 43629215201(*) Federal Aid No: D523021B Project(s): 43629215603 Federal Aid No: N/A Project(s): 43629215604 Federal Aid No: N/A Total Roadway Length: 1.197 Miles Total Bridge Length: 0.000 Miles Total Proposal Length: 1.197 Miles Contract Days: 870 Contract Execution Days: 10 Special Start Date: N/A Aquis/Flexible Start Time: 60 Days Please read the full advertisement Description: The Improvements under this Contract consist of New Road Construction, New Bridge Construction, MSE Walls, Interchange (New), Curb and Gutter, Bike Path/Trail, Sidewalk, Guardrail, Traffic Signals, Signing and Pavement Marking, Overhead Signing, Intelligent Transportation Systems, and Utility Contracts on State Road 9 (I-95) from MP 18.355 to MP 19.552, approximately 1.2 miles in Volusia County. For projects in excess of $50 million, in addition to meeting all other qualification requirements of Section 337.14, Florida Statutes, and Rule Chapter 14-22, Florida Administrative Code, any Contractor who is not prequalified and in good standing with the Department as of January 1, 2019, must submit evidence which demonstrates satisfactory completion of at least two projects, each in excess of $15 million, for the Florida Department of Transportation or for any other state department of transportation. Acceptability of the evidence related to the two projects is at the sole discretion of the Department. Question Deadline 07/24/2024 at 5:00 PM Questions posted to this site will be responded to by the Department. For questions posted after this time, an answer cannot be assured. For all questions posted before the deadline, FDOT will provide and post responses on online. For bids over $150,000.00, the standard proposal guaranty of 5% of the bid will be required, unless otherwise stipulated in the proposal advertisement. A Proposal Guaranty of not less than five percent (5%) of the total actual bid in the form of either a certified check, cashier's check, trust company treasurer's check, bank draft of any national or state bank, or a Surety Proposal Guaranty made payable to the Florida Department of Transportation must be received for each bid in excess of $150,000.00 A 100% Payment and Performance Bond will be required for all projects. All work is to be done in accordance with the Plans, special Provisions of the State of Florida Department of Transportation. FDOT - Call Order: 001 - Interchange (New) - Bridge Construction / Drainage Improvements / Embankment / Excavation
GC Bidding
Roads / Highways
$98,023,236.00
Public - State/Provincial
New Construction, Paving, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
7
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 26, 2025
April 28, 2025
FL-9, New Smyrna Beach, FL
Related To This Project
New Smyrna Beach, FL
Bid Date: Aug 19 2024
New Smyrna Beach, FL
Bid Date: Aug 07 2024
New Smyrna Beach, FL
Bid Date: Aug 08 2024
New Smyrna Beach, FL
Bid Date: Aug 02 2024
New Smyrna Beach, FL
--
New Smyrna Beach, FL
--
New Smyrna Beach, FL
Bid Date: Aug 28 2024
New Smyrna Beach, FL
Bid Date: Sep 10 2024
New Smyrna Beach, FL
Bid Date: Jul 29 2024
New Smyrna Beach, FL
Bid Date: Jul 11 2024
New Smyrna Beach, FL
Bid Date: Jul 09 2024
New Smyrna Beach, FL
Bid Date: Aug 28 2024
New Smyrna Beach, FL
Bid Date: Oct 08 2024
New Smyrna Beach, FL
Bid Date: Jul 16 2024
New Smyrna Beach, FL
Bid Date: Jul 25 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.