Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published October 17, 2024 at 8:00 PM
Updated October 1, 2024
Renovation of an educational facility in Winnipeg, Manitoba. Design plans call for the renovation of a educational facility.
The existing labs will be demolished which includes a reduction of the number of existing fume hoods. To compensate for this reduction there will need to be the addition of more targeted ventilation to exhaust gases and remove heat as required. The instrumentation that will remain are X-ray diffractometer (require its own electrical breaker box), high temperature furnaces of different shape and geometries and different power needs and the vacuum line with multiple 110V supplied pumps. The space will be a general use space which will consist of a mix of teaching, lab prep, and research lab as required to meet departmental needs. These upgrades will ensure that University of Manitoba students have access to modern equipment, tools, and technologies. It will allow the University to continue to build the kinds of spaces that will nurture life-changing ideas, game-changing innovations, and the highest standards of academic success. Finishes, furnishings, equipment, and infrastructure will be brought up to current standards in the effort to provide innovative spaces for University of Manitoba students. The scope includes but is not limited to the following: - Review of each Lab requirements to determine what configuration supports the Lab efficiently as utilized by the faculty. There is a desire to include a "shared" office space that is accessible from each Lab separately and will need to be planned into the space. Discussions regarding room capacity, daily activities and Lab equipment type should also take place. - Demolition of existing fume hoods to reduce the current quantity. Some new fume hoods will be required along with a targeted ventilation system for the exhaust of gases/heat. Replacement of all Lab benching/cabinets Flooring replacement. - Acoustic ceiling tile replacement. - Patching & painting of walls. - Lighting and lighting control replacement. Data & electrical modifications to suit new room layout and AV requirements. - Mechanical upgrades required to suit new plans and lab equipment. - New furniture: Loose Furniture: The requirement for furniture will be minimal. Loose furniture is anticipated to be required for the office location (height adjustable tables), loose chairs as well as stools for use throughout the lab space. U of M will procure furniture (through PO), and this will not need to be included within the construction contract. The UM AES Department has invited architectural firms to submit specific proposals that best illustrate their respective qualifications. It is expected that the prime consultant or members of their team will have experience in the design of post- secondary learning spaces and have knowledge of AV coordination and integration. The prime consulting firm will include architectural, mechanical, electrical, structural engineering services as well as an environmental consultant (for asbestos abatement) within their collaborative team. TIMELINE: Detailed design has commenced. Contact at the architect is unreleased. Tender may be issued early 2025 with construction to commence spring 2025.
Design
Educational
$680,000.00
Public - State/Provincial
Renovation
We’ve obtained documents for this project and are currently processing them.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 31, 2025
144 Dysart Rd, Winnipeg, MB
Related To This Project
Winnipeg, MB
Bid Date: Jun 13 2024
Winnipeg, MB
Bid Date: Jun 13 2024
Winnipeg, MB
Bid Date: Jun 17 2024
Winnipeg, MB
Bid Date: Jun 24 2024
Winnipeg, MB
Bid Date: Jun 20 2024
Winnipeg, MB
Bid Date: Jun 19 2024
Winnipeg, MB
Bid Date: Jul 10 2024
Winnipeg, MB
Bid Date: Jun 12 2024
Winnipeg, MB
Bid Date: Jun 20 2024
Winnipeg, MB
Bid Date: Jun 12 2024
Winnipeg, MB
Bid Date: Jun 26 2024
Winnipeg, MB
Bid Date: Jun 12 2024
Winnipeg, MB
Bid Date: Jun 18 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Unlock Efficiency: The Future of Commercial Construction is Data-Driven
Sign up now to get free company and project data. No payment required.
.webp)
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.