BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of an educational facility in Winnipeg, Manitoba. Design plans call for the renovation of a educational facility.

The existing labs will be demolished which includes a reduction of the number of existing fume hoods. To compensate for this reduction there will need to be the addition of more targeted ventilation to exhaust gases and remove heat as required. The instrumentation that will remain are X-ray diffractometer (require its own electrical breaker box), high temperature furnaces of different shape and geometries and different power needs and the vacuum line with multiple 110V supplied pumps. The space will be a general use space which will consist of a mix of teaching, lab prep, and research lab as required to meet departmental needs. These upgrades will ensure that University of Manitoba students have access to modern equipment, tools, and technologies. It will allow the University to continue to build the kinds of spaces that will nurture life-changing ideas, game-changing innovations, and the highest standards of academic success. Finishes, furnishings, equipment, and infrastructure will be brought up to current standards in the effort to provide innovative spaces for University of Manitoba students. The scope includes but is not limited to the following: - Review of each Lab requirements to determine what configuration supports the Lab efficiently as utilized by the faculty. There is a desire to include a "shared" office space that is accessible from each Lab separately and will need to be planned into the space. Discussions regarding room capacity, daily activities and Lab equipment type should also take place. - Demolition of existing fume hoods to reduce the current quantity. Some new fume hoods will be required along with a targeted ventilation system for the exhaust of gases/heat. Replacement of all Lab benching/cabinets Flooring replacement. - Acoustic ceiling tile replacement. - Patching & painting of walls. - Lighting and lighting control replacement. Data & electrical modifications to suit new room layout and AV requirements. - Mechanical upgrades required to suit new plans and lab equipment. - New furniture: Loose Furniture: The requirement for furniture will be minimal. Loose furniture is anticipated to be required for the office location (height adjustable tables), loose chairs as well as stools for use throughout the lab space. U of M will procure furniture (through PO), and this will not need to be included within the construction contract. The UM AES Department has invited architectural firms to submit specific proposals that best illustrate their respective qualifications. It is expected that the prime consultant or members of their team will have experience in the design of post- secondary learning spaces and have knowledge of AV coordination and integration. The prime consulting firm will include architectural, mechanical, electrical, structural engineering services as well as an environmental consultant (for asbestos abatement) within their collaborative team. TIMELINE: An RFP for design has been awarded. Work is underway. Updates may be available late 2024.

Design

Educational

$680,000.00

Public - State/Provincial

Renovation

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
82
Active Projects
48
Bidding Soon
521
All Active Projects
209
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

February 10, 2025

August 16, 2025

img_map_placeholder

144 Dysart Rd, Winnipeg, MB

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.