Published September 25, 2024 at 8:00 PM

Updated September 26, 2024

Site work for a water / sewer project in Winnipeg, Manitoba. Completed plans call for site work for a water / sewer project.

The Work to Be Done Under the Subsequent Contract Shall Consist of: (a) Coordination of Shallow Utility Relocations With Various Utilities, as Required Depending Upon Shaft Locations. Relocation of Building Sewer and Water Services Depending Upon Shaft Locations. (B) Relocation of Approximately 800 M of 300, 375 and 450 Mm Combined Sewer (Conversion to Wastewater Sewer) Including Manholes and Relocation of Sewer Services. Temporary Relocation and Bypass Pumping of the Ness Avenue Combined Sewer Trunk to Accommodate the Tunneling Work. (C) Construction of Launch and Retrieval Shafts. a Maximum of 7 Shafts is Anticipated (Including a Partial Shaft at the Transition From Tunneled to Open Trench Installation). (D) Installation of Approximately 1,960 M of 2400 Mm Reinforced Concrete Trunk Land Drainage Sewer, Primarily by Trenchless (Microtunneling) Methods but Including Up to 250 M of Open Trench Sewer Near the Assiniboine River Where the Depth of Cover is Believed to Be Too Shallow for Tunneling. (E) Installation of Associated Land Drainage Sewer Appurtenances Including Saddle Type Manholes Along the Trunk and the Installation of Smaller Diameter Lateral Stubs at the Assiniboine Avenue Active Transportation Pathway and Crossing Streets to Accommodate Future Sewer Connections. (F) Installation of a River Outfall, Including a Short Riprap Lined Channel. a Gate Chamber is Not Required. (G) Several Alternative Alignments for the Sewer River Outfall Have Been Developed and Are Shown as a Sketch in Appendix a. Each Alignment Has Different Pros and Cons With Regards to the Removal of Mature Trees and Impact to Existing Park and Community Facilities. the Selection of Alignment Will Be Done in Consultation With Community Stakeholders. (H) Two Alternative Alignments Have Been Developed for the Upper End of the Sewer Near the Extension of St. Matthews Avenue. the Selection Will Be Done in Consultation With Community Stakeholders. (I) Replacement of Existing and Installation of New Catch Basins and Catch Basin Leads Along the Route and Connection Into the New Trunk Land Drainage Sewer. (J) Restoration of Parkland, Trees, Pavements, Boulevards and Other Features Impacted by the Works. (K) a Social Procurement Clause Will Be Included in the Subsequent Tender. The Social Procurement Clause May Address Outcomes Around Employment of Equity Groups, Skills and Training of Equity Groups, or Diversity in the Supply Chain. Official bid documents must be obtained from www.merx.com and bid submissions must be done through the Merx platform.

Post-Bid

Water / Sewer

$5,000,000.00

Public - City

Site Work

26

6

2

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
103
Active Projects
44
Bidding Soon
538
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 10, 2024

February 3, 2025

Project location map

Ferry Rd, Winnipeg, MB

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.