Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and paving for a road / highway in Saginaw, Michigan. Completed plans call for site work for a road / highway; and for paving for a road / highway.
Dixie Highway - Willard to Birch Run Road This work consists of furnishing and placing HMA mixture(s), utilizing Superpave mixture design techniques, onto a Stress Absorbing Membrane Interlayer (SAMI) chip seal. The project contains dry process crumb rubber modified HMA demonstration (test) sections(s) that will be evaluated for long term performance by the Engineer, in conjunction with Michigan Technological University (MTU), and the Michigan Department of Environment, Great Lakes & Energy (EGLE) Furnish HMA mixtures of the Standard Specifications for Construction, except as modified herein. This specification includes mix specifications for control HMA mixture(s) and crumb rubber modified HMA mixture(s). Adjust all equipment and methods as necessary to properly accommodate the modifications specified herein. Prepare and submit to the Engineer and MTU an HMA Test Section Paving Proposal for approval. The Engineer will schedule a Mandatory HMA pre-production meeting at least 7 calendar days prior to the start of HMA production. Required personnel shall include the Project Superintendent, Paving Superintendent, HMA-QC Plan Administrator, and any subcontractor involved in HMA quality control, sampling, or testing. HMA production and paving will not be permitted until the HMA Test Section Paving Proposal is approved by the Engineer and the mandatory pre-production meeting has been held. Furnish all HMA mixtures not specified herein according to Standard Specifications. Place all HMA mixtures according to Standard Specifications for Construction and the HMA Application Estimate. Major items of work: HMA,GTR 14,074 TON Trenching,Modified 200 STA Cold Milling HMA Surface 52,618 SYD If any person contemplating submitting a proposal is in doubt as to the true meaning of any part of the drawings, specifications or other contract documents, or finds discrepancies in or omissions from the drawings or specifications, he/she may submit to the Engineer a written request for an interpretation or correction thereof. The person submitting the request will be responsible for its prompt delivery. Any interpretation or correction of the documents will be made only by addendum, duly issued, and a copy of the addendum will be mailed or delivered to each person receiving a set of the contract documents. Neither the Owner nor the Engineer will be responsible for any other explanations or interpretations of the contract documents.
Award
Roads / Highways
$2,141,468.00
Public - County
Paving, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 26, 2024
July 15, 2024
Dixie Hwy, Saginaw, MI
Related To This Project
Saginaw, MI
--
Saginaw, MI
Bid Date: Jul 03 2024
Saginaw, MI
Bid Date: Jul 02 2024
Saginaw, MI
Bid Date: Jul 24 2024
Saginaw, MI
Bid Date: Jun 28 2024
Saginaw, MI
Bid Date: Jul 01 2024
Saginaw, MI
Bid Date: Jul 17 2024
Saginaw, MI
Bid Date: May 31 2024
Saginaw, MI
Bid Date: May 31 2024
Saginaw, MI
Bid Date: Jun 11 2024
Saginaw, MI
Bid Date: May 31 2024
Saginaw, MI
Bid Date: Jun 06 2024
Saginaw, MI
Bid Date: May 30 2024
Saginaw, MI
Bid Date: Jun 03 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.