BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work for a water / sewer project in Los Angeles, California. Working plans call for site work for a water / sewer project.

Existing Conditions: Existing 5 main water lines (6" Domestic Hot Water, 8" Cold Water Pressurized, 8" Cold Water Supply, 12" Fire Water, and 6" Condensate) from Building 501 (Chiller Building) to Building 500 (Hospital) including Building 501 basement, Building 500 basement, and the tunnel from 501 to 500. Because these existing water lines are in bad condition/end of their useful life, they need to be replaced to prevent catastrophic failure/see examples below. Objective: Construct 5 bypass lines, approx. 450' and divert water to these pipes. Then replace approx. 400' of the 5 lines. Then remove the bypass lines. Notes: -Current tunnel includes a pipe rack with multiple pipes, and an adjacent walkway. The space is tight. To allow for proper replacement of the 5 pipes, a bypass route has been defined to bypass the lines and allow the hospital to fully function during replacement of pipes. -Contractor to provide all parts, equipment, labor and materials required to make a harmonized removal, for connections of existing wet supply lines and reinstallation of diverse water lines parallel to existing system and consistent with any new piping, fittings, valves, regulators, strainers for regulators, gages, manifold, isolation valves and redundant bypass -Contractor will provide and maintain temporary water service for main hospital during alterations -Contractor must have knowledge of/past performance with methodology of construction procedures/phasing schedules at VA facilities -Not a DB or DBB project -Design being completed at USACE Los Angeles District by USACE Engineers.

Final Planning

Water / Sewer

$500,000.00

Public - Federal

Site Work

Our team is requesting plans for this project.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
206
Active Projects
104
Bidding Soon
2,236
All Active Projects
993
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 2, 2024

img_map_placeholder

To Be Determined, Los Angeles, CA

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.