BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a mixed-use development in Montecito, California. Completed plans call for the renovation of a laboratory facility; and library.

Library and iLab Renovation PROJECT LOCATION: 385 San Ysidro Road, Santa Barbara, CA 93108 This project is anticipated to start approximately July 15, 2024, and is anticipated to be completed by September 27, 2024 The Work of Project consists of: a. Remodel of iLab 1) Paint and finishes. 2) Electrical work. 3) Provide ventilation for Owner-furnished laser cutter. a) Includes roof penetrations with flashing and modifications to existing clay tile roofing. 4) Replace three Owner-Furnished windows 5) Install finishes to close existing openings b. Remodel of Library 1) Installation of Owner-furnished bookcases, casework, riser seating, decorative column covers, round seats and accessories/trim (Bid Alternate 1) 2) Installation of Owner-furnished countertops (Bid Alternate 1) a) Reinstallation of sink at countertop (Bid Alternate 1) 3) Paint touch up 4) Carpet and wall base a) Wall base at Owner-furnished bookcases, riser seating and round seats (Bid Alternate 1) 5) Electrical work 6) Install finishes to close existing openings c. Remodel of Media Room 1) Paint and finishes d. IT Room 1) Electrical Work e. Additional work as indicated. This is a prevailing wage project. OWNER has ascertained the general prevailing rate of per diem wages in the locality in which this work is to be performed for each craft or type of worker needed to execute this contract. . A Payment Bond for contracts over $25,000 and a Performance Bond for all contracts will be required prior to commencement of work. These bonds shall be in the amounts and form called for in the Contract Document Pursuant to the provisions of Public Contract Code Section 22300, CONTRACTOR may substitute certain securities for any funds withheld by OWNER to ensure CONTRACTOR's performance under the contract. At the request and expense of CONTRACTOR, securities equivalent to any amount withheld shall be deposited, at the discretion of OWNER, with either OWNER or a state or federally chartered bank as the escrow agent, who shall then pay any funds otherwise subject to retention to CONTRACTOR. Upon satisfactory completion of the contract, the securities shall be returned to CONTRACTOR OWNER will retain 5% of the amount of any progress payments

Award

Library

$315,267.00

Public - City

Renovation

21

12

3

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
69
Active Projects
43
Bidding Soon
789
All Active Projects
324
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 8, 2024

July 15, 2024

img_map_placeholder

385 San Ysidro Rd, Montecito, CA


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.