Published August 27, 2024 at 8:00 PM

Updated October 1, 2024

Site work and paving for a mixed-use development in Pittsburgh, Pennsylvania. Working plans call for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; and swimming pool.

**As of August 27, 2024 bids received were rejected as they were over the budget.No definite date for the rebid .** Contract No. 24-PK1 (Re-Bid) - General Construction: The scope of work generally includes selective demolition; renovations to existing pool including concrete floor and wall repairs; construction of zero entry and ramp into pool; concrete walkway replacement; installation of 60 mil liner, gutter system, and various accessories/amenities; and all necessary appurtenances. There will be two separate contracts with and without zero entry and associated spray amenities. Any technical questions regarding the bid documents are to be directed to LSSE. The project is being financed, in part, by the RAAC via a GEDTF Grant, and by CFA via a GTRP Grant. Bidder must agree to comply with all requirements associated with the grants. Compliance is required with the Pennsylvania Prevailing Wage Act of 1961, P.L. 987, No. 442; Title VI and other applicable provisions of the Civil Rights Act of 1964; the Department of Labor Equal Opportunity Clause (41 CFR 60 -1.4); Executive Order 11625 (Utilization of Minority Business Enterprise); Executive Order 12138 (Utilization of Female Business Enterprise); in compliance with Section 504 of Rehabilitation Act of 1973 and Americans with Disabilities Act of 1990; the Allegheny County MBE/WBE Program enacted July 1981, which sets forth goals of 13 percent Minority and 2 percent Female Business Enterprise; and the Allegheny County Ordinance #6867-12, setting forth goals of 5 percent Veteran Owned Small Businesses. Bond Notes: The bid must be accompanied by a bid bond in the amount of ten percent (10%) of the bid, made payable to the Borough of Baldwin. Owner Rights: The Borough reserves the right to reject any or all proposals and to waive any informalities in the bidding. No bid may be withdrawn for ninety (90) calendar days after the scheduled time for receipt of bids. Contract No. 24-PK1 (Re-Bid) - General Construction: The scope of work generally includes selective demolition; renovations to existing pool including concrete floor and wall repairs; construction of zero entry and ramp into pool; concrete walkway replacement; installation of 60 mil liner, gutter system, and various accessories/amenities; and all necessary appurtenances. There will be two separate contracts with and without zero entry and associated spray amenities. Contract No. 24-PK2 (Re-Bid) - Plumbing: The scope of work generally includes selective demolition of existing equipment and piping; installation of new pump and chemical feed system (supplied by others) and associated plumbing; and new supply and return lines for gutter system and spray amenities. There is an add alternate for a grinder pump lift station, forcemain and connection to existing manhole. Contract No. 24-PK3 (Re-Bid) - Electrical: The scope of work generally includes selective demolition of existing electrical; electrical supply and connections to new pumps, controllers and mechanical equipment; site lighting; 100AMP electrical panel. There is an alternate for electrical supply for grinder pump lift station. Contract No. 24-PK4 (Re-Bid) - Mechanical: The scope of work generally removal of existing pool heater and flue; installation of new pool heater (supplied by others) and flue including roof penetration; and all necessary appurtenances.

Final Planning

Sidewalks / Parking Lot

$1,479,519.00

Public - City

Paving, Site Work

45

17

2

6

Subscribe For Documents

13 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, References, Definitions, Reference Standards, Temporary Facilities and Controls, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Cleaning and Waste Management, Final Cleaning, Closeout Procedures, Closeout Submittals, Warranties, Spare Parts, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition, Site Remediation
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Accessories, Concrete Reinforcing, Reinforcing Steel, Welded Wire Fabric Reinforcing, Cast-in-Place Concrete, Precast Concrete, Precast Structural Concrete, Mass Concrete
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Clay Unit Masonry, Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing, Cold-Formed Metal Framing, Metal Fabrications
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Membrane Roofing
Division 08 - Openings

Division 08 - Openings

Hardware, Glazing, Glass Glazing
Division 09 - Finishes

Division 09 - Finishes

Finishes, Tiling, Ceilings, Wall Finishes, Stone Facing, Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Exterior Specialties, Protective Covers
Division 12 - Furnishings

Division 12 - Furnishings

Furnishings and Accessories, Bedroom Furnishings, Blankets
Division 13 - Special Construction

Division 13 - Special Construction

Special Facility Components, Swimming Pools, Tubs and Pools
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Lifts
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, Meters and Gages for Plumbing Piping, General-Duty Valves for Plumbing Piping, Hangers and Supports for Plumbing Piping and Equipment, Plumbing Insulation, Plumbing Piping and Pumps, Facility Water Distribution
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Meters and Gages for HVAC Piping, General-Duty Valves for HVAC Piping, Hangers and Supports for HVAC Piping and Equipment, HVAC Insulation, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Pumps, HVAC Air Distribution, HVAC Ducts and Casings, Metal Ducts, Air Duct Accessories, Dampers
Division 26 - Electrical

Division 26 - Electrical

Electrical, Medium-Voltage Electrical Distribution, Medium-Voltage Transformers, Low-Voltage Electrical Distribution, Low-Voltage Transformers, Electrical and Cathodic Protection, Facility Lightning Protection, Lighting, Interior Lighting, Exterior Lighting
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Site Clearing, Earth Moving, Grading, Finish Grading, Excavation and Fill, Subgrade Preparation, Excavation, Dewatering, Fill, Backfill, Compaction, Erosion and Sedimentation Controls, Shoring and Underpinning, Shoring, Sheet Piling, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Operation and Maintenance of Planting, Fertilizing, Common Work Results for Exterior Improvements, Bases, Ballasts, and Paving, Rigid Paving, Concrete Paving, Curbs and Gutters, Paving Specialties, Pavement Markings, Planting, Planting Preparation, Mulching, Turf and Grasses, Plugging, Seeding, Plants, Trees
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities, Water Utilities, Water Utility Distribution Piping
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Coastal Construction, Shoreline Protection
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Lifting Devices, Lifts
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
179
Active Projects
125
Bidding Soon
1,017
All Active Projects
466
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 12, 2024

February 20, 2025

img_map_placeholder

742 Lechner Ln, Pittsburgh, PA


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Baldwin Swimming Pool Improvements

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.