EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published July 29, 2024 at 8:00 PM

Updated October 1, 2024

Site work and outdoor lighting for a road / highway in Charleston, West Virginia. Completed plans call for site work for a road / highway; and for outdoor lighting for a road / highway.

Contract : 2022200017 State Project : U320-119-11.73 00 Federal Project HSIP-0119(504)D County: Kanawha Lighting Mp 11.73 (Cr 119/99) to Mp 14.03 (Wv 601) Kanawha Parkway Road - Davis Creek I/c Lighting DBE Goal: 7% of Contract Bid Amount. Bidder Must Provide Written Assurance of Meeting Goal on Form in Proposal Proposals will be received from prequalified and West Virginia licensed contractors only except that on Federal-Aid Projects a contractors' license is not required at time of bid, but will be required before work can begin. Registration is required with the Department of Administration, Division of Purchasing, in accordance with Chapter 5A, Article 3, Section 12 of the West Virginia Code. All contractors submitting bids on project(s) must submit electronically with their bid a Proposal Guaranty Bond for $500.00 or 5% of the total bid, whichever is greater. The West Virginia Department of Transportation, Division of Highways reserves the right to defer, delay or postpone the date for receiving and publicly opening proposals for any project designated in this advertisement, without the necessity of renewing such advertisement. All bidders holding valid bidding proposals will be notified of such deferment, delay or postponement and the date that proposals will be received and publicly opened. WVDOT - 015 - Parkway Road - Davis Creek I/C Lighting DESCRIPTION: Functional Requirements-The primary function of the CCTV system is to verify nonstandard conditions detected by the system, surveillance ofmajor construction projects, events, or other reported information from an external source. Images from CCTV cameras will be displayed at operator workstations within the WVDOH Transportation Management Center (TMC) via the ATMS platform, the CCTV output is required to be displayed on a limited number of peripheral systems as designated by the ITS Coordinator. The Contractor is responsible for integration of the CCTV communication to the WVDOH Transportation Management Centers (TMC) working with the ATMS platform provider, or their designee. Closed Circuit Television (CCTV) camera installation Contractor requirements: 1. General electrical work as a prime or as a subcontractor -five (5) years. 2. Communications, including radio, wire and wireless - one (1) year. All electrical work shall conform to current requirements ofthe National Electrical Code, latest edition, all local codes and Section 631 ofthe Standard Specifications. All details not specified or not shown on the Plans shall conform to the requirements ofthe latest issue ofthe Manual on Uniform Traffic Control Devices, (referred to as the MUTCD). This Manual is published by the Federal Highway Administration of the U.S. Department of Transportation and supplemented by the publication Official Ruling on Request and the West Virginia Division ofHighways Traffic Engineering Division Directives.

Bid Results

Roads / Highways

$3,832,446.00

Public - State/Provincial

Outdoor Lighting, Site Work

3

6

7

6

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
85
Active Projects
45
Bidding Soon
366
All Active Projects
177
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 16, 2024

September 16, 2024

img_map_placeholder

Parkway Rd, Charleston, WV


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.