BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of an educational facility in New York, New York. Completed plans call for the renovation of a educational facility.

Liquidated Damages: One Thousand ($1,000) Dollars per Continuous Calendar Day and as set forth in the All questions by prospective bidders concerning this solicitation should be directed, in writing at least three (3) business days prior to the originally scheduled, or, if applicable, postponed bid opening date to rfimentor@nycsca.org using the project solicitation number in the subject line as indicated in the following example: RFIMENTOR 24-12345D-1 Smith and Jones Construction. Please send all Questions to rfimentor@nycsca.org. however, if you have any additional questions or issues please contact Y. Mitchell, Contract Administrator at E-mail: ymitchell@nycsca.org or at Phone Number: (718) 472-8335 SCOPE OF WORK A. Provide labor, materials, tools, machinery, equipment, and services necessary to complete the HVAC Work under this Contract. All systems and equipment shall be complete in every aspect and all items of material, equipment and labor shall be provided for a fully operational system and ready for use. Coordinate the work with the work of the other trades in order to resolve all conflicts without impeding the job progress. B. Examine the Architectural, Structural, Plumbing and Electrical Drawings and other Divisions, and Sections of the Specifications in order to determine the extent of the Work required to be completed under this Division. Failure to examine all the Contract Documents for this Project will not relieve the Contractor of his/her responsibilities to perform the Work required for a complete fully operational and satisfactory installation. C. The Work includes but is not limited to the following systems, equipment and services: 1. Remove, relocate and protect existing refrigeration equipment and piping as indicated on drawings. 2. Provide refrigeration and piping as indicated on drawings. D. Start-up services shall be included in the bid. E. All systems, equipment and services specified herein shall be provided complete and ready for use. F. General Contractor and Mechanical Contractor are to facilitate the coordination of the control features provided by all trades, vendors, and equipment manufacturers and the TCC for a complete seamlessly integrated system of operation. Before submitting any equipment shop drawings for approval, the HVAC Contractor, and the Equipment Vendor and Manufacturer shall coordinate the controls required for the system.

Bid Results

Educational

$1,000,000.00

Public - City

Renovation

31

21

2

3

Subscribe For Documents

29 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
492
Active Projects
297
Bidding Soon
4,460
All Active Projects
2,000
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 17, 2024

July 17, 2024

img_map_placeholder

350 Linwood St, New York, NY


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.