BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 12, 2024 at 7:00 PM

Updated November 13, 2024

Site work and paving for a mixed-use development in Treasure Island, Florida. Completed plans call for site work for a golf course; sidewalk / parking lot; and for paving for a sidewalk / parking lot.

Treasure Bay Living Shoreline and Golf Course Construction Question Deadline 09/16/2024 Bidder shall submit all questions about the meaning or intent of the Bidding Documents to Engineer in writing. Contact information and submittal procedures for such questions are as follows: A. Please submit all questions in writing to Mike Munger, Finance Director | Purchasing Coordinator for the City of Treasure Island at mmunger@mytreasureisland.org 7.03 Interpretations or clarifications considered necessary in response to such questions will be issued by Addenda delivered to all regist Treasure Island will restore their waterfront at the Golf and Tennis Center into a functional living shoreline. The project will include public education, removing sections of seawall, installing seawall enhancement features, planting marsh grass and improving the existing ponds (littoral shelves) to enhance water quality prior to entering Boca Ciega Bay. The City owns the Treasure Bay Golf and Tennis Center; this site is comprised of approximately 17 acres along Boca Ciega Bay. The City is undertaking the development of a Parks Master Plan to include the Treasure Bay facility. The goals within this plan are to enhance the site's resiliency by creating a living shoreline, restore the ecological function of the stormwater ponds, provide public education as it relates to sustainability, and add additional recreational opportunities to connect the community with the natural environment. This facility has an existing 2,300 linear feet of dilapidated seawall along the northern and eastern boundaries. Under this scope, the City will develop a multi-year plan, complete with design and specifications to replace portions of the seawall with a living shoreline. While this scope includes the construction of a living shoreline along the northern side of the property, the eastern shoreline, which is adjacent to a high wake zone of the intercostal waterway, will be designed for construction under a future project to create a living seawall which can protect the shoreline from boat wakes, while providing ecological benefits and local water quality improvement benefits by reducing the toe score associated with wave action. In addition, the golf course has two hydraulically-connected water hazard ponds, the south of which drains directly into Boca Ciega Bay; the City would like to improve the water quality entering the Bay by removing nutrient-laden sediment and installing littoral shelves and aeration within the ponds. Native plants will be used to absorb nutrients and create wildlife refuges.

Bid Results

Sidewalks / Parking Lot

$2,890,239.00

Public - City

Paving, Site Work

34

8

15

3

Subscribe For Documents

75 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
268
Active Projects
121
Bidding Soon
1,702
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 28, 2024

November 25, 2024

Project location map

Multiple Locations, Treasure Island, FL

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.