BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 28, 2026 at 8:00 PM

Updated May 29, 2026

Site work and new construction of a water / sewer project in Treasure Island, Florida. Completed plans call for the construction of a water / sewer project; and for site work for a water / sewer project.

The City of Treasure Island intends to contract with a qualified contractor to perform the demolition and disposal of the existing Master Pump Station and construct a new Master Pump Station replacement including wet well and pumps, elevated generator and controls platform, odor control unit, and dedicated access driveway. Demolition activities on the existing Master Pump Station cannot commence until the new facility is demonstrated to be complete and accepted for operation by the City. Questions Due @ 12pm June 8, 2026 Questions concerning the ITB should be submitted by email to dgreen@mytreasureisland.org The City of Treasure Island reserves the right to accept or reject any or all Bids, to waive technical errors, irregularities or informalities in any Bids received, and to accept the Bid which is deemed by the City to best serve the City. Any bids received after the specified date and time will not be considered. The public meeting to open all bids will be held shortly after the closing date/time at the City of Treasure Island Helm Boardroom, 3 rd Floor, located at 10451 Gulf Boulevard, Treasure Island, FL. Questions concerning the ITB should be submitted by email to dgreen@mytreasureisland.org by June 8, 2026 at 12 PM. All questions will be answered and posted on the City's portal by June 12, 2026 at 5 PM. The City of Treasure Island is soliciting bids from qualified, experienced contractors to furnish all labor, materials, equipment and services required for the demolition and removal of the existing Master Pump Station and the construction of a new, below grade Master Pump Station replacement. All work shall be completed in accordance with the design plans and specifications prepared by Kimley-Horn The City of Treasure Island intends to contract with a qualified contractor to perform the demolition and disposal of the existing Master Pump Station and construct a new Master Pump Station replacement including wet well and pumps, elevated generator and controls platform, odor control unit, and dedicated access driveway. Demolition activities on the existing Master Pump Station cannot commence until the new facility is demonstrated to be complete and accepted for operation by the City. The project shall be executed in full compliance with the engineered drawings and specifications developed by Kimley-Horn, including all necessary labor, materials, equipment and associated services.

GC Bidding

Water / Sewer

$8,000,000.00

Public - City

New Construction, Site Work

60

11

2

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
245
Active Projects
105
Bidding Soon
1,985
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 22, 2026

August 21, 2026

Project location map

120 108th Ave, Treasure Island, FL


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.