BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 16, 2024 at 8:00 PM

Updated September 17, 2024

Site work for a mixed-use development in Edmonton, Alberta. Completed plans call for site work for a road / highway; sidewalk / parking lot; and water / sewer project.

The project consists of mobility improvements to 2nd Ave NW and 7th Ave NW Corridor including traffic calming measures and wheeling lanes. It will also include mobility improvements for the 3 Ave NW Corridor including widened sidewalks on both sides of the road to accommodate increased pedestrian movements between Kensington and the Sunnyside LRT. Scope includes removals, installation of hardscape elements, modifications to storm water infrastructure, asphalt milling and paving, and landscape rehabilitations. Bidding documents are to be obtained from, and bids submitted to, the SAP Business Network portal.

Award

Sidewalks / Parking Lot

$4,631,733.00

Public - City

Site Work

73

12

68

2

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
58
Active Projects
26
Bidding Soon
542
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 18, 2024

September 1, 2024

Project location map

Multiple Locations, Edmonton, AB

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.