BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition, site work, paving and addition to a mixed-use development in Brookshire, Texas. Completed plans call for the addition of a bridge / tunnel; for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; water / sewer project; bridge / tunnel; and for the demolition of a bridge / tunnel.

The deadline to ask questions is 6/22/2024 2:00 PM CST In ample time to permit consideration before reply, submit questions about bidding instruments to the Engineer. Questions will not be considered after 2:00 p.m., three (3) calendar days prior to bidding. Estimate: $8,700,000 The work consists of providing the necessary labor, material, equipment, and supervision to construct Tamarron Wastewater Treatment Plant Expansion to 0.6 MGD and in Fort Bend County Municipal Utility District No. 222. TAMARRON WEST WASTEWATER TREATMENT PLANT EXPANSION TO 0.6 MGD: The site work contractor is responsible for all site work, including but not limed to clearing and grubbing of the site; expansion of the capacity of the existing lift station including bypass pumping, demolition and replacement of three (3) submersible pumps with all accessories, riser piping, valves and coatings; yard piping, effluent piping and manholes; reclaimed water pump station wet well with top slab; final effluent measurement chamber; site work; crushed concrete roads and IWTP pads; a steel elevated headworks structure with manual bar screen and flow-splitting weirs, protective coatings, underground piping at Train Nos. 1, 2 & 3; concrete pads and sidewalks; swales, culverts, and inlets; new electrical service; service entrance equipment; diesel generator and automatic transfer switch; underground duct banks; pull boxes; bollards; site grading; all associated electrical and site work; facility start-up in its entirety; and all else specified and shown in the construction documents and not specifically addressed in lease agreement, complete in place for a fully functioning plant. The lease of the 400,000 gallon per day interim package wastewater treatment plant facilities, tertiary filtration facilities, and dechlorination facilities shall include delivery and assembly of the facilities with all accessories and equipment; including aeration basins; multi-stage digester units; final clarifiers; chlorine contact basins; non-potable water systems; chlorination equipment and chlorination buildings; tertiary filters and backwash pumps; dechlorination equipment (including dechlorination submersible mixing pumps); dechlorination feed equipment building; eyewash and safety showers with canopies; walkways, bridges, and handrails; air diffusion equipment; air lifts; flow measurement equipment; blowers; aboveground interconnecting piping, valves, fittings, supports; hose bibbs; control panels for equipment including the blowers, clarifier, non-potable water system, chlorination equipment and effluent flow measurement; tertiary filters, dechlorination equipment, dechlorination submersible mixing pumps, lighting, and all other electrical plant devices; plant lighting; and electrical wiring (including wiring to the service rack); and all accessories, equipment, piping, etc. within the plant, complete as specified. Within the lease scope is all the plant related functions from the stub up for the screened influent piping upstream of the aeration basins and the stub up for the effluent piping downstream of the chlorine contact basins; from the stub ups upstream and downstream of the tertiary filters; and dechlorination feed equipment, dechlorination submersible mixing pumps and everything in between. The installation of the leased facilities shall be the responsibility of the lease plant vendor. Installation includes all delivery, installation and start-up. The site work contractor shall coordinate with the lease plant vendor for all connections and slab dimensions. At the leased facilities, the site work contractor is responsible for all site work shown in the construction drawings including all work not associated with the leased facilities. However, the site work contractor is responsible for concrete slabs and pads, and all buried piping located within the limits of the proposed leased facilities. All buried piping shall be installed with a flanged stub-up approximately 12-inches (12") above finished grade at all locations or connected to the buried clarifier hopper for piping coming from the clarifiers. The site work contractor shall perform all electrical work including connection from a new electrical service to the service rack including all aboveground conduit and wire to pads. The plant lease contractor is responsible for all electrical work downstream of the local control panels, including the control panels. The site work contractor is responsible for all underground duct bank work and all other electrical work from the main service rack to the local control panels. The site work contractor is responsible for coordination with plant lessor firm to coordinate pipe and electrical connections, buried pipe locations, deliveries and schedules.

Post-Bid

Water / Sewer

$8,700,000.00

Public - County

Addition, Demolition, Paving, Site Work

75

22

32

4

Subscribe For Documents

81 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
339
Active Projects
220
Bidding Soon
4,312
All Active Projects
1,784
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

July 2, 2024

September 2, 2024

July 22, 2025

img_map_placeholder

4143 Woods Rd, Brookshire, TX

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.