Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published June 18, 2024 at 8:00 PM

Updated June 19, 2024

Renovation of a mixed-use development in Iron Mountain, Michigan. Completed plans call for the renovation of a educational facility.

The Iron Mountain Public Schools District (referred to as IMPS) is looking to replace worn roof sections on the East Elementary and Izzo-Mariucci/Administration buildings. Both building's worn roof sections are currently ballast style roofs. The district is seeking proposals that would include options for ballast style and mechanically-fastened style. The East Elementary section includes the roofs that are above the 1994 addition to that building. The roof above the 1994 section is ballasted. The original portion of the building was constructed in 1960. That portion of the roof is mechanically-fastened. The Izzo-Mariucci/Administration Building section includes the roofs that are above the gymnasium (constructed 1964) and 2003 addition. These roofs are ballasted and were likely installed in 2003. The remaining portion of the roof is mechanically-fastened and was installed in 2013 or 2014. If a vendor has a question about the RFP, they may email rfp@imschools.org. Emailed questions are preferred. Vendors may also call the Administration Office at (906) 779-2600.

Post-Bid

Educational

$200,000.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
35
Active Projects
14
Bidding Soon
304
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 18, 2024

July 18, 2024

Project location map

Multiple Locations, Iron Mountain, MI

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed