BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Fort Myers Beach, Florida. Conceptual plans call for site work for a water / sewer project.

Water Meter Replacement. r liquidated damages. Such liquidated damages shall be computed with respect to each individual laborer or mechanic, including watchmen and guards, employed in violation of the clause set forth in paragraph (1) of this section, in the sum of $27 for each calendar day on which such individual was required or permitted to work in excess of the standard workweek of forty hours without payment of the overtime wages required by the clause set forth in paragraph (1) of this section. Scope of Work The purpose of this RFP is to standardize all water meters to a single meter/ert combination. This mass meter replacement is an integral step that will eventually allow the Town to remotely collect readings from these meters and manage them via the Advanced Metering Infrastructure (AMI) system that is currently in place. This AMI system will improve accuracy and efficiency in water meter reading collection, meter health monitoring, leak detection, etc. Minority-Owned, Woman-Owned, and Small Business Enterprises are encouraged to respond to this solicitation. The Town of Fort Myers Beach reserves the right, in its sole judgment in the best interest of the Town of Fort Myers Beach, to waive any informalities in any bids; to make award(s) including multiple awards; to waive any non-substantive, in Town's sole judgment, irregularity or technicality in bids received, and/or to reject any or all bids. The TOWN reserves the right to waive informalities in any bids; to reject any or all bids with or without cause; and/or to accept the bid that in its judgment will be in the best interest of the TOWN. This solicitation may be cancelled, or any or all bids or proposal may be rejected in whole or in part with or without cause. The TOWN will require a Public Construction Bond on this project. Per owner this project has been cancelled.

Project Abandoned

Water / Sewer

$2,000,000.00

Public - City

Site Work

1

6

6

Subscribe For Documents

29 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
49
Active Projects
24
Bidding Soon
394
All Active Projects
158
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 16, 2024

September 16, 2024

img_map_placeholder

To Be Determined, Fort Myers Beach, FL

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.