BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition and site work for a mixed-use development in Roan Mountain, Tennessee. Completed plans call for site work for a swimming pool; for the demolition of a swimming pool; and water / sewer project.

Any prospective Respondent having questions and comments concerning this ITB must provide them in writing to the Solicitation Coordinator. All questions must be submitted no later than June 17, 2024 This request for bids is for a contract to furnish all material, equipment, supplies and labor to demolish the main and kiddie swimming pool to include removing pool liner, pool water treatment equipment and plumbing, pool aggregate, pool decks and refill-compact voids to existing grade. Additionally, the water treatment building will be excavated around the exterior, waterproofed, and backfilled. 3. The Contractor shall demo the pool liner by cutting into sections or using equipment to remove and load for disposal. 4. The Contractor shall demo stainless steel skimmers, pool water treatment equipment and plumbing within the treatment building, and any other metal found in pool demo site. This material must be removed from state park property, and Contractor is responsible for disposal off-park in accordance with all applicable laws and regulations. 5. The water treatment building, located under the back diving board area shall remain. The Contractor shall carefully excavate enough away from the wall to allow for the wall to be properly cleaned and repaired, all pipes removed, and all penetrations patched. The Contractor shall provide and install Polyguard Underseal PRM or equal 65-mil self-adhering sheet waterproofing membrane/vapor retarder on three sides of building in a vertical application, a 4-inch (four-inch) perforated and filtered drainage tile (below floor slab) sloped to daylight and backfill with #57 stone and 3-foot by 4-inch (three-foot by four-inch) concrete poured concrete cap along three sides. Care shall be taken to protect building from damage from pool fill compaction. 6. The Contractor shall start in the deep end (12-foot) marked area breaking up shotcrete/ gunnite floor and walls. Starting at this point, the Contractor shall compact replacement fill dirt at 1-foot (one-foot) intervals with vibratory roller compaction. It shall be acceptable for the Contractor to break aggregate into pieces no more than 5-inches (five-inches) in size and add a layer of broken aggregate at 1-foot (one-foot) intervals. Each foot of fill soil shall have no more than 6-inches (six-inches) of broken aggregate added on top. No pieces of aggregate more than 5-inches (five-inches) in size shall be used as fill. No aggregate fill within 4-feet (four-feet) of final grade. 6. The Contractor shall supply fill material of clay/sand mixture as needed to within 1-foot (one-foot) of grade. The Contractor shall supply and compact 1 foot (one foot) of topsoil for final grade. No fill material is available on the park. 9. The Contractor shall provide 1 foot (one foot) of topsoil over the entire work site. 10. The Contractor shall remove the fence and dispose of it off park in accordance with all applicable laws and regulations. 11. The Contractor shall Harley rake area before seeding and straw. Five bales of straw and 5 pounds (five pounds) of fescue seed per acre shall be broadcast over the entire site at completion of work. 12. Any concrete containing re-enforcement rod shall be removed from park property. No broken-up aggregate shall be used as backfill if it contains metal or re-bar.

Post-Bid

Swimming Pools

$80,000.00

Public - State/Provincial

Demolition, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
175
Active Projects
108
Bidding Soon
1,275
All Active Projects
565
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

June 24, 2024

July 24, 2024

October 15, 2024

img_map_placeholder

527 TN-143, Roan Mountain, TN

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.