BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and outdoor lighting for a playground / park / athletic field in Ontario, Oregon. Completed plans call for site work for a playground / park / athletic field; and for outdoor lighting for a playground / park / athletic field.

The Ontario School District is seeking proposals from qualified Contractors to remove existing football field lighting system in its entirety. Question Deadline 06/10/2024 at 4:00 PM MT Any vendor requiring clarification or protesting any provision herein must submit specific questions, comments, or protest, in writing to the District, at the same address where proposals are due. T Install new upgraded football field lighting and infrastructure. Schedule and work alongside track replacement contractors. Remove existing incandescent lighting system in its entirety from the football stadium. This will include; 1. removal of existing electrical service between poles and back to Idaho Power poles 2. removal of electrical transformers and disposal 3. removal of all incandescent field lights 4. removal of track light fixtures and repurposed or returned to owner 5. removal of parking lot lighting fixtures and repurposed or returned to owner 6. removal of all eight wooden poles to a depth of two feet below ground level 7. open holes to be filled in with the appropriate matching materials to create a smooth, flat walking surface (earth or solid material) 8. wooden poles to be disposed of properly 9. New lighting plan to be developed by contractor and approved for LED lighting and repurposing of existing track and parking lot lighting. 10. Electrical power for new field lighting to be installed underground from new service provided by Idaho Power to new poles. This will include trenching through soil, under asphalt and concrete on both east and west side of stadium. Contractor responsible for completing utility locations prior to trenching. Contractor will be responsible for patch back of all materials. 11. Existing sound system to be repurposed on new metal poles 12. District requires enclosures with remote drivers, main pole disconnects, and breakers that feed each fixture for serviceability and surge protection. 13. Each pole needs to have infrastructure for mounting track lighting at night. 14. West poles need to have infrastructure for mounting the existing parking lot lights on the west side of the pole in addition to track side lighting and speakers for the sound system. 15. Contractor to be responsible for any plan approvals, permitting, inspections, and working with any of the public utilities necessary for their approval 16. District requires 50 foot candle average or as close to as possible. 17. A uniformity Ratio of 2:1 or better. 18. A 5000K color temperature. 19. District has an October 4, 2024 deadline for project completion. 20. Incoming power to the stadium will be 120/240 single phase. 30,000 fc :: Musco Sports Lighting :: $325,000 50,000 fc :: Musco Sports Lighting :: $375,000

Award

Playgrounds / Parks / Athletic Fields

$700,000.00

Public - City

Outdoor Lighting, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

4

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
16
Active Projects
3
Bidding Soon
186
All Active Projects
63
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 20, 2024

July 12, 2024

img_map_placeholder

To Be Determined, Ontario, OR

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.