BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

This is a service / maintenance or supply contract in Temecula, California. Contact the soliciting agency for additional information.

Exterior & Interior Surfaces: On all exterior surfaces, Contractor shall use a steam cleaning system with vacuum extraction of the rinse water to an onsite wastewater cleaning system that removes oil, grease, metals, and solids. Pretreated waste rinse water shall be discharged to the sanitary sewer. Offsite treatment and disposal of waste rinse water is unacceptable. Any chemical treatment and disposal of waste rinse water is unacceptable. Any chemical solvents or cleaning products used in the cleaning process must be approved by the city of Temecula for sewer discharge or removed from the waste rinse water during the pre-treatment process. The contractor shall pick up all liquid rinse water leaving minimal residual surface moisture and shall provide containment devices to prevent run-off from entering gutters and drains. No pollutants or cleaning streams may enter adjacent vegetation, storm drain systems, or waterways. "Zero Discharge" shall be maintained at all times, and shall comply with both Federal and State Guidelines pursuant to title 22. Oil & Water-Based Products: Surfaces intended for coating should be clean, sound, and uniform in nature. To achieve maximum coating life, surfaces should be cleaned of dirt, grease, rust, and moisture. Sharp edges, irregular areas, cracks, and holes should be repaired before application. When filling masonry, plaster, metal, wood, or wallboard, the area should be cleared of loose debris. Apply compound with a putty knife or trowel and smooth off the surface so it is slightly convex to allow for shrinkage. All nicks, gauges, scrapes, and damage to trim should be filled with filler, sanded, and smooth. All holes shall be filled with filler, sanded, and smoothed. Any items that are protruding shall be set, then filled, sanded, and smoothed. Wood Preparation: Remove all dirt, dust, grime, oils, mildew, and loose paint by power washing or hand washing. Scrape off all loose or flaking paint. Spot prime all bare wood and new wood using a primer. Caulk with silicone latex around doors, windows, and small cracks. Large holes and cracks should be caulked using an exterior ten (10) year caulk. Old caulk that is loose or cracked will be removed. Online Q&A Yes Q&A Deadline 06/19/2024 10:00 AM (PDT) License Requirements Proponent shall identify, obtain, and provide any and all licenses, permits, clearances, reports, and documents required. Project Duration It is the intent of the City to award a five (5) year agreement. The City reserves the right to accept or reject any or all responses and proposals received in response to this RFP, to waive minor irregularities, to negotiate with any qualified source, or cancel in whole or in part this RFP if it is in the best interest of the City to do so, and to take all proposals under advisement for a period of ninety (90) days. If an agreement cannot be negotiated the City reserves the right to negotiate with any other finalists.

Post-Bid

Municipal

Public - City

Service, Maintenance and Supply

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
231
Active Projects
110
Bidding Soon
2,359
All Active Projects
1,048
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 26, 2024

July 26, 2024

img_map_placeholder

Multiple Locations, Temecula, CA

Related To This Project


Try it free. The data you need to build the relationships you want.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.