BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 10, 2024 at 8:00 PM

Updated September 11, 2024

Site work and paving for a road / highway in Livingston, Alabama. Completed plans call for site work for a road / highway; and for paving for a road / highway.

Sumter County Contract Time: 35 Working Days for constructing the Safety Improvements (Guardrail and Guardrail End Anchor Installations) on CR-2 over Unnamed Branch from a point approximately 300' east of the junction of McCoy Road (Site 1); on CR-2 over Unnamed Branch from a point approximately 900' west of the junction of Hull Road (Site 2); on CR-2 over Unnamed Branch from a point approximately 0.600 mile west of the I-20/I-59 Overpass (Site 3); and on CR-2 over Unnamed Branch from a point approximately 0.260 mile west of the junction of West End Court (Site 4) in York. Length 0.168 mi. The Bracket Estimate on this project is from $229,820 to $280,891 . If further clarification is needed, please contact the Plans and Proposal Section of the Bureau of Office Engineer with any questions you may have. We strongly encourage you to e-mail us at offengr@dot.state.al.us. We will work with you to resolve any issues. The total amount of uncompleted work under contract to a contractor must not exceed the amount of his or her qualification certificate. Minimum Wage Rates have been pre-determined by the Secretary of Labor and are set forth in the advertised specifications. Federal Aid Projects are also subject to the contract work hours and Safety Standards Act and its implementing regulations. Cashier's check or bid bond for 5% of bid (maximum - $50,000.00) made payable to the Alabama Department of Transportation must accompany each bid as evidence of good faith. The Alabama Department of Transportation, proposals will be issued only to prequalified contractors or their authorized representatives, upon requests that are received before 10 AM., on the day previous to the day of opening of bids. The bidder's proposal must be submitted on the complete original proposal furnished him or her by the Alabama Department of Transportation. The right to reject any or all bids is reserved. ALDOT - Call 12 - Safety Improvements (Guardrail and Guardrail End Anchor Installations) on CR-2 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Award

Roads / Highways

$272,433.00

Public - State/Provincial

Paving, Site Work

10

3

5

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
51
Active Projects
31
Bidding Soon
334
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 28, 2024

July 29, 2024

Project location map

Co Rd 2, Livingston, AL

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.