BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work, renovation and addition to an educational facility in Livingston, Alabama. Completed plans call for the addition of a educational facility; for the renovation of a educational facility; and for site work for a educational facility.

General Description: The work includes approximately a 15,200 sf addition and renovation to Homer Field House for the University of West Alabama. The addition and renovation will be of the existing locker room and shower areas. The second floor will be of the toilet rooms, classroom/gathering areas and addition of an outdoor covered patio and access bridge. Pursuant to State Law a cashier's check or bid bond payable to the Owner in an amount not less than five (5) percent of the amount of the bid, but in no event more than $10,000.00, must be enclosed with the bid to secure the bid for at least 30 days. Conditional bids will be rejected. A list of major subcontractors must be submitted as indicated in the Supplemental Instructions to Bidders. Performance and Payment Bonds and evidence of specified insurance are pre- requisites of contract award. The right is reserved by the Awarding Authority to reject all bids and to waive irregularities. The Owner reserves the right to reject any or all proposals and to waive technical errors if, in the Owner's judgment, the best interests of the Owner will thereby be promoted.

Post-Bid

Educational

$45,000.00

Public - State/Provincial

Addition, Renovation, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

13 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
35
Active Projects
15
Bidding Soon
235
All Active Projects
105
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 15, 2024

November 15, 2024

img_map_placeholder

100 US-11, Livingston, AL

Related To This Project


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.