BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a municipal facility in Potsdam, New York. Completed plans call for the renovation of a municipal facility.

7013 SH 56 Potsdam NY 13672 - Scope of Work Items - Furnish and Install various rehabilitation materials and labor to include: Misc. Lead Rehab per LBP Risk Assessment, Four (4) new vinyl replacement windows - LBP Item, New Metal Roof. Additionally, the Bid will also require new smoke & carbon monoxide detectors per Code. The contractor will ensure that to the greatest extent feasible opportunities for training and employment arising in connection with this NYS CDBG-assisted project will be extended to lower-income project area residents. Further, the contractor will, to the greatest extent feasible, utilize business concerns located in or substantially owned by residents of the project area, in the award of contracts and purchase of services and supplies. MWBEs and Section 3 contractors are encouraged to apply. The attention of Bidders is particularly called to the requirements as to lead certifications. The right is reserved to waive any informalities in the Bid and to reject any or all Bids. General Items/ Spec: A.) Painting shall include at a minimum, 1 coat of primer and 2 coats of paint. Paint and primer shall be manufactured by Valspar or approved equal. If work is performed in a bathroom or kitchen, the paint shall be approved for the particular location. Interior paint shall indicate "interior latex" and Exterior paint shall indicate "exterior latex". Colors and finish (gloss shall be chosen from "standard colors" by owner. B.) Plumbing materials- Sanitary sewer drains shall be of Schedule 40 PVC or match existing. Traps and appurtenances may be of thin-walled PVC or equal. Waterlines and fittings shall be of type "K" copper, PVC and /or Pex C.) Any items removed as part of the project shall become property of the Contractor and shall be hauled off-site unless tagged by owner for re-use ------------------------------------------------------------------------------------------------------------------------------------------ 1. Smoke & Carbon Monoxide Detectors a. Furnish & Install new smoke detectors per local code(s). Furnish and install a carbon monoxide detector per local code(s). 2. Lead Rehab - See Lead Risk Assessment a. Re-habilitate lead risks as applicable and call for lead clearance. Lead clearance shall be obtained prior to demobilization. See attached Lead Risk Assessment for hazards to be rectified. Where the recommendation is "Paint film stabilization" the Contractor shall wet scrape/sand, and re-paint to match existing unless material(s) were/are previously disposed by the Contractor as a function of the above work scope. All "soil hazards" shall be rectified by removing the soils 3 inches below subgrade and disposing. After disposal of soils, place geotextile over removed area and install 3 inches of new topsoil then seed. All lead contaminated materials that are/were removed shall be disposed of as highlighted within the Contract Documents 3. WINDOWS - Lead Based Paint Item a. Furnish & install four (4) new vinyl replacement Egress windows on in the three (3) bedrooms two (2) in 1 bedroom and one (1) each in two (2) other bedrooms. Windows shall be double hung, low E, and argon filled where applicable. Replacement basement windows shall be tilting vinyl double pane, low E, and argon filled. Caulk and insulate around window as applicable. Existing windows shall be removed and hauled off-site by the contractor. 4. ROOF a. Furnish & Install new metal roofing. Strip existing roof to exposed rafters. Install 5/8 CDX plywood to rafters for the roof Deck. Under no circumstances shall the roof(s) be open to inclement weather. Furnish and install a new corrugated metal roof (color selected from standard colors by owner). New roof shall include drip edge, fasteners/hardware, valleys, flashing, ridge caps, and any and all other appurtenances to furnish & install a new corrugated metal roof in its entirety per local code(s). Corrugated metal shall be hot dipped galvanized aluminum, minimum of 29 gauge with a "Ceram-A-Star" (Kynar) finish or approved equal. In addition, the metal shall come with a 40 year manufacturer's warranty to the owner. Furnish and Install new facia board (1X6), facia and soffit (metal coil), hardware/fasteners, and any and all appurtenances to furnish & install facia in their entirety. All colors including corrugated metal to be selected by owner from "standard colors". b. Install snow guards for entire roof

Occupancy

Municipal

$30,000.00

Public - County

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

4

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
178
Active Projects
105
Bidding Soon
1,646
All Active Projects
584
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 25, 2024

July 25, 2024

img_map_placeholder

7013 NY-56, Potsdam, NY

The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.