BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a laboratory facility in Fargo, North Dakota. Completed plans call for site work for a laboratory facility.

Bolley Agricultural Laboratory - Building #168 - Bid Package #2 INTRODUCTION The proposed project will include construction of a new 1-to-2-story building with partial basement and partial mechanical rooftop penthouse located southwest of the intersection of 18th Street and 17th Avenue N. on the campus of North Dakota State University in Fargo, North Dakota. To assist planning and design, you have authorized American Engineering Testing, Inc. (AET) to conduct a subsurface exploration program at the site, conduct soil laboratory testing, and perform a geotechnical engineering review for the project. This report presents the results of the above services and provides our engineering recommendations based on this data. Work Included in this Offering: We are presently soliciting competitive "Lump Sum Bids" for the following portions of work as defined herein. 1. All portions of the Work as defined in Section 00 2400 2. 3-D Polished Concrete 3. 6-A Carpentry 4. 6-D Architectural Millwork 5. 7-L Sealants 6. 8-A Doors/Frames/Hardware 7. 8-D Specialty Doors 8. 9-A Interior Framing & Drywall 9. 9-B Tile 10. 9-C Ceilings 11. 9-D Flooring 12. 9-G Fluid Applied Flooring 13. 9-K Painting 14. 12-C Window Treatments 15. 13-E Grain Drying Equipment 16. 20-A Combined Mechanical 17. 21-A Fire Suppression 18. 26-A Combined Electrical Method of Delivery: Kraus-Anderson Construction Company has been pre-selected as the Construction Manager/Contractor by North Dakota State University to facilitate the construction of Bolley Agricultural Laboratory - Building #168 at North Dakota State University. 1. This project consists of a new agricultural lab on a green field site with a combined area of approximately 154,000 square feet. 2. The work will be constructed in one (1) phase in accordance with the Project Schedule. 3. The herein referenced documents will enable your firm the opportunity to submit a detailed proposal. We look forward to receiving your Proposal and would like to extend our appreciation for your participation in advance of receiving your proposal on the enclosed Bid Form. Cut Off Date for Questions and Interpretations: June 21, 2024, 4:00 pm local time. Questions shall be submitted to Kraus-Anderson Construction Company at the address below on or before the Date indicated above. dan.walter@krausanderson.com. *Addendum 1, 2, 3 and 4 have been released.

Post-Bid

Laboratories

$1,000,000.00

Public - State/Provincial

Site Work

402

35

144

Subscribe For Documents

14 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
18
Active Projects
11
Bidding Soon
119
All Active Projects
45
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 9, 2024

July 29, 2024

img_map_placeholder

1650 18th St N, Fargo, ND

The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.