BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 2, 2024 at 8:00 PM

Updated July 3, 2024

Site work and paving for a mixed-use development in Fort Wayne, Indiana. Completed plans call for site work for a road / highway; sidewalk / parking lot; for paving for a sidewalk / parking lot; water / sewer project; and road / highway.

The Board of Public Works of the City of Fort Wayne, Indiana, that sealed bids for: North Clinton Street Sidewalk Connection Phase 2 The Bidder shall furnish all labor, insurance, equipment, materials and power for the complete performance of this project as follows: This project will include the construction of 5' to 7.5' wide concrete sidewalks on the east and west sides of North Clinton Street. The limits of the project will run from S.R. 930 to St. Joe Center Road. The project will include construction of retaining walls, ADA curb ramps, signal modernization, pedestrian crossings with push buttons, sidewalk connections, storm drainage improvements, and restoration All in accordance with the Bidding Documents and Drawing No. ST- 0346S as prepared by Transportation Engineering for the City of Fort Wayne, Indiana. No bid will be accepted from, or contract awarded to any person, firm, or corporation that is in arrears to the City, upon any debt or contract, or who has failed to execute, in whole or in part in a satisfactory manner, any contract with the City; or, who is a defaulter as to surety or otherwise, upon any obligation to the City. No bid may be withdrawn after the scheduled time for receipt of bids for at least ninety (90) days to allow review of bids before announcing award of contract. The successful bidder may be required to furnish a satisfactory Labor and Material Payment Bond and Performance Bond each in the amount no less than one hundred (100%) percent of the contract price. The Board reserves the right to reject any and all bids for failure to comply with applicable laws and/or with the Instructions to Bidders. The Board also reserves the right to waive any defect in any bid. EBE GOALS – The City goal for qualified Emerging Business Enterprise (E.B.E), as subcontractors on this project is ten percent (10%) of the contract amount.

Award

Sidewalks / Parking Lot

$2,180,755.00

Public - City

Paving, Site Work

56

29

8

6

Subscribe For Documents

16 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
192
Active Projects
133
Bidding Soon
1,233
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 27, 2024

August 26, 2024

Project location map

N Clinton St, Fort Wayne, IN


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.