BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 18, 2024 at 8:00 PM

Updated July 19, 2024

Demolition, site work and paving for a playground / park / athletic field in Carver, Massachusetts. Completed plans call for the demolition of a playground / park / athletic field; for site work for a playground / park / athletic field; and for paving for a playground / park / athletic field.

Town of Carver Operations & Maintenance Department 108 Main Street Carver, MA 02330 508-866-3425 Carver Pickleball Courts 48 Lakeview Street Carver, MA 02330 Town Bid No. 062624 June 1, 2024 The Operations & Maintenance Department is requesting bids from contractors with experience and references to construct pickleball courts including but limited to furnishing all equipment, materials, and labor necessary to perform demolition, fencing, paving, painting, and other site work for courts located at 48 Lakeview Street Carver, MA 02330. The Town of Carver reserves the right to accept or reject any or all bids in total or in part as they may deem to be in the best public interest. Question Deadline 06/21/2024 All questions about the meaning or intent of the Bidding Documents shall be submitted to OWNER (Town of Carver, Purchasing Coordinator, Shelby Roy, Shelby.Roy@carverma.gov) in writing ONLY. GENERAL SCOPE OF WORK A. The Town of Carver Pickleball Project shall include: 1. The demolition of existing site features to include, but not limited to, removing any remaining fence poles and foundations from the previous tennis court, strip and stockpile topsoil, maintenance of turtle protection barrier and compliance with the established Turtle Protection Plan, and clearing and grubbing as detailed in the contract documents. 2. Installation and maintenance of erosion controls. 3. The construction of Pickleball courts, including demolition, paving, surface coatings and markings, fencing, gates, nets and all other appurtenances shown on the drawings. 4. Installation of reclaimed asphalt millings for parking lot and walkways, signage, and wheel stops, as detailed in the contract documents. 5. Various site improvements including landscaping, walkways, fencing, grading, loam and seeding, bollards, and all other requirements, as detailed in the contract documents. 6. Installation of a sand filter system and grass pretreatment strip.

Award

Playgrounds / Parks / Athletic Fields

$277,163.00

Public - City

Demolition, Paving, Site Work

9

27

3

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
452
Active Projects
93
Bidding Soon
3,437
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 26, 2024

July 26, 2024

Project location map

48 Lakeview St, Carver, MA


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.