BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 15, 2025 at 8:00 PM

Updated April 16, 2025

Renovation of a transportation facility in Waukegan, Illinois. Completed plans call for the renovation of a 13,400-square-foot transportation facility.

https://www.masstransitmag.com/technology/facilities/press-release/55280197/pace-suburban-bus-pace-breaks-ground-on-northern-division-garage Pace breaks ground on Northern Division Garage The project will create the region’s first bus facility designed to support an all-electric fleet and move forward Pace’s transition to a zero-emission fleet. From left to right: Fox Lake, Ill., Mayor Donny Schmit; Lake County Board Member John Wasik; North Chicago Mayor Leon Rockingham; Lake County Board Member Marah Altenberg; Lake County Board Vice-Chair Mary Ross-Cunningham; Pace Executive Director Melinda Metzger; Pace Chairman Rick Kwasneski; Pace Board Member Linda Soto; Lake County Chair Sandy Hart; Rep. Joyce Mason (D-IL-61); Round Lake Mayor Russell Kraly; Waukegan City Clerk Janet Kilkelly. Pace Suburban Bus broke ground on the renovation of the North Division Garage. Pace notes the project will create the region’s first bus facility designed to support an all-electric fleet and move forward its transition to a zero-emission fleet. According to Pace, the upgrades to this facility places Waukegan at the forefront of Project Zero, the agency’s initiative to reduce pollution and honor statewide climate goals by converting its entire bus fleet to zero-emissions technology by 2040. "Today marks another step forward in Pace’s commitment to a zero-emission future," said Pace Chairman Rick Kwasneski. "We already have a few zero-emission and hybrid buses in service, but this facility will take our sustainability efforts to the next level. Once completed, North Division will have the capacity to charge and house a fleet of 60 zero-emission buses." Pace notes the electrification of the North Division Garage is being funded through Rebuild Illinois and federal grants. The agency estimates that fully achieving Project Zero will require approximately $2.5 billion in funding, which includes facility upgrades and vehicles. "Pace is incredibly proud of our commitment to operating a zero-emission fleet, and I am proud of our personnel for embracing this operational change,” said Pace Executive Director Melinda Metzger. “Our North Division Garage has always been a major contributor to Lake County, providing public transit to the residents including essential workers, seniors, people with disabilities and students, so I am glad we can make this critical investment to Waukegan.” "This project is one of the most important milestones in Pace’s journey towards operating a more sustainable fleet, and I am thrilled that this milestone is taking place here in Lake County," said Pace Board Member Linda Soto.” According to Pace, the first zero-emission buses are expected to operate out of Waukegan by late 2025 following the installation of 12 chargers and the construction of a covered outdoor charging facility. The second phase of the project, expanding and modernizing the entire garage, is expected to be completed by 2027. ------------------------------------------------------------------------------------------------------------- The work consists of expanding the bus storage area by 13,400 sf, which will replace the north wall and will add approximately 7,650 sf of exterior wall. Removing and replacing the roofing, structural reinforcement of the roof structure, new roof mounted exhaust fans, overhead crane, and fall protection. Upgrading the facility electrical system, as the recommended charging strategy uses medium voltage power (12kV-50kV). Procuring and installing chargers and overhead charging pantographs for 60 BEB's. Installation of a new parking lot spaces, upgrading and replacing the fire protection systems, office administration area improvements and renovations, and bus fueling, parts, storage, and bus repair area improvements. Trades included but not limited to: Structure & Selective Demolition, Concrete Forming, Accessories, & Reinforcing, Structural Concrete, Concrete Curing, Precast Architectural Concrete, Masonry, Structural Steel Framing, Steel Decking, Metal Fabrications, Metal Stairs, Railings, & Gratings, Misc. Carpentry, Plastic Laminate-Faced Architecture, Roofing, Insulation, Penetration & Joint Firestopping, Joint Sealants, D/F/H, Coiling Counter Doors, Overhead Coiling Doors, Aluminum Framed Entrances & Storefronts, Aluminum & Security Windows, Glazing, Drywall, Ceramic Tiling, Acoustical Panel Ceilings, Resilient Base & Accessories, Resinous Flooring, Tile Carpeting, Sound Absorbing Wall & Ceiling Units, Painting, Visual Display, Display Cases, Signage, Folding Panel Partitions, Wall Protection, Toilet, Bath, & Laundry Accessories, Fire Protection Cabinets & Extinguishers, Metal Lockers, Postal Specialties, Mobil Storage Shelving, Vehicle Equipment & Lifts, Loading Dock Bumpers, Seals & Shelters, Stationary Loading Dock Equipment, Residential Appliances, Roller Window Shades, Countertops, Entrance Floor Mats & Frames, Furniture, Elevators, Lifts, Fire Protection, Plumbing, HVAC, Electrical, Communications, Electronic Safety & Security, Site Clearing, Grading, Excavation, Dewatering, Asphalt & Concrete Paving, Parking Bumpers, Pavement Markings, Chain Link Fencing, Site Furnishings, Landscaping Planting, Site Utilities, Traffic Control Equipment, & Aboveground Atmospheric Tanks. Note that an Addendum will be issued to reflect the change in date/time for the Pre-Proposal Meeting. Interested parties must download the complete solicitation package, including all addenda, at Open Solicitations | Pace Suburban Bus (pacebus.com) under Solicitation No. 423178. Bidders must submit their bid to Pace via email to Bids@pacebus.com no later than 7/25/24 by 2:00 p.m. Central Time. Please respond to joseph.nezlick@pacebus.com and evan.roglich@pacebus.com confirming your company's participation in the above Pre-Proposal Meeting and Vendor Site Visit. Question Deadline 06/24/2024 at 2:00 PM CT Any questions regarding this solicitation must be submitted to Pace via email to questionsandanswers@pacebus.com prior in order to receive a response from Pace

Award

Transportation Terminals

$1,000,000.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

36

Subscribe For Documents

50 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
520
Active Projects
286
Bidding Soon
3,701
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 25, 2024

November 25, 2024

Project location map

1400 10th St, Waukegan, IL


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.