BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 21, 2025 at 8:00 PM

Updated April 22, 2025

Site work, paving and new construction of a bridge / tunnel in Dahlonega, Georgia. Completed plans call for the construction of a bridge / tunnel; for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

0.448 Mile of Construction of a Bridge and Approaches on Sr 52 Over Chestatee River. Counties: Lumpkin DBE Goals: 8.00% Proposal Guaranty: 5% Completion Date: 11/30/26 District: District 1 - Gainesville, Area Office 4 - Cleveland Question Deadline 04/04/2025 at 11:00 Am Et in Order to Accomplish This, All Questions and Comments Must Be Submitted by the Close of Business of the Friday Two Weeks Before the Letting. All Questions and Comments Received After the Friday Before the Week of the Letting Will Be Documented, but a Response Will Not Be Provided. Questions or Comments Call (404) 631-1147 For Those Contractors Who Are Currently Prequalified as a Gdot Construction Prequalified Contractor or Registered Subcontractor Through Gdot"S Construction Bidding Administration Office, and Want to Be Prequalified to Perform Maintenance Projects Under the Routine Maintenance Services Program, There is Now a Modified Prime Contractor's Application Form Available. We Welcome You to Participate. The Application Form and All Applicable Documents, Resources and Other Guidance May Be Found on the Gdot Website. Proposal Guaranty in the Indicated Amount in the Form of a Certified Check, Cashier's Check or Bid Bond on the Form Issued by the Department. The Surety for Bid Bonds and Performance and Payment Bonds Shall Be a Company Acceptable as Surety on Federal Bonds and Listed in the Current Federal Register and Licensed in the State of Georgia. This Advertisement is Merely an Invitation for the Submission of Bids Which Will Be Considered as Offers for Performance of Work by the Submitting Party. The State Reserves the Right to Reject Any or All Bids. For Any Related Issues, Please Contact the Following Individual: Kimberly King 404-631-1972 Should You Have Questions or Need Assistance, Contact William Dunwoody at 404-631-1147. Should You Construction Bidding Administration at 404-631-1147. Quantities Shown Herein Are for Information Only and Should Not Be Used for Bidding Purposes. The Department Reserves the Right to Change These Quantities Without Notice. GADOT - 008 - Construction of a Bridge and Approaches on Sr 52 Over Chestatee River.

Bid Results

Bridges / Tunnels

$7,144,132.00

Public - State/Provincial

New Construction, Paving, Site Work

194

8

16

5

Subscribe For Documents

18 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
306
Active Projects
188
Bidding Soon
2,237
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 18, 2025

June 17, 2025

Project location map

GA-52, Dahlonega, GA


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.