BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Dubuque, Iowa. Completed plans call for site work for a water / sewer project.

Each Bidder must accompany its Bid with a Bid security as security that the successful Bidder will enter into a contract for the work Bid upon and will furnish after the award of contract a corporate surety Bond, acceptable to the governmental entity, for the faithful performance of the contract, in an amount equal to one hundred percent of the amount of the contract. The Bid security must be in the amount of ten percent (10%) of the amount of the contract and must be in the form of a cashier's check or certified check drawn on a state-chartered or federally chartered bank, or a certified share draft drawn on a state chartered or federally chartered credit union, or the Bidder may provide a Bid Bond with corporate surety satisfactory to the governmental entity. The Bid Bond must contain no conditions except as provided in this section. By virtue of statutory authority, preference will be given to products and provisions grown and coal produced within the State of Iowa, and to Iowa domestic labor, to the extent lawfully required under Iowa statutes. The scope of the project is as follows: o Installation of approximately 500-feet of 12-inch ductile iron water main o The new water main will be installed at a lower depth and the existing water main will be removed and salvaged o Installation of 2 fire hydrants o Installation of a 12-inch water main stub for the future extension of 12-inch water main along Airborne Road. o Installation of a 6-inch water main stub for the extension of a 6-inch water service line to the future Kwik Trip Site o Lowering of approximately 100 feet of City fiber optic conduit o Excavating and hauling approximately 1,850 cubic yards of soil to an off-site location to complete the associated grading. Estimated Total Cost = $258,000.00 There will be no Pre-Bid Construction Conference held for this project. City Hall - Conference Room B, 50 West 13 th Street, Dubuque, Iowa, for consideration by the City Council at its meeting on Monday, July 1, 2024.

Bid Results

Water / Sewer

$186,275.00

Public - City

Site Work

19

6

4

Subscribe For Documents

20 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
63
Active Projects
39
Bidding Soon
576
All Active Projects
254
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 20, 2024

July 22, 2024

img_map_placeholder

Seippel Rd, Dubuque, IA


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.