BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Santa Maria, California. Completed plans call for site work for a water / sewer project.

Amendment 1. Solicitation 127EAW24R0058. Project: Santa Maria Air Tanker Base Water Manifold Replacement, Los Padres National Forest This solicitation amendment is provides RFI Official Responses and extends the proposal due date. The offer due date is extended to NLT August 5th, 2024. 5PM (PST). Note: No additional RFIs shall be accepted prior to the revised proposal due date. This amendment is hereby incorporated into any subsequent contract award. Failure to use the revised document and requirements revised within will result in your proposal being non-responsive. PROJECT: Santa Maria Air Tanker Base Water Manifold Replacement Los Padres National Forest This project involves the replacement and upgrade from the current diameter PVC to 6" galvanized steel and/or appropriate metal plumbing of the current backflow valve assembly including but not limited to all fittings, water meter, backflow assembly, valves, flanges, and other items associated with the present unit. In accordance with current statutes, there shall be a concrete pad around the assembly and concrete thrust blocks at the ninety-degree fittings below grade. There shall be a replacement of the 'fill side' of the pipe where the ridged section meets a flexible section. This will be at an elevation to allow the flexible pipe to be moved across an existing section of curb. There is a section of pipe near the primary supply valve, approximately 150 yards to the South-East, that has a reduced diameter. This pipe, now 4", is a formerly replaced section of the original 6" pipe. This section, approximately ten feet long and approximately three feet below grade is to be replaced with pipe equal to the rest of the plumbing. This is to insure proper volume and pressure to the retardant manufacturing and dispensing process. The project also includes replacing a section of the 2" section of pipe which is connected by a 'Tee' which is reduced from six to two inch and leads to additional plumbing fixtures. This 2" section shall remain at this size. All fixtures must adhere to current county, state and applicable statutes including but not limited to any FAA directives. Total Small Business Set-Aside IAW FAR 36.204 Disclosure of Magnitude of the Construction Project - Between $25,000 - $100,000 Important Notes: Refer to complete continuation pages for bid schedule, scope, specifications, exhibits, and all other information and terms. Section B.2 provides notes on the bid schedule and bid submission. Section A provides proposal submission instructions and requirements and Site Visit information. In no event shall failure to inspect the site constitute grounds for a claim after contract award. Questions / RFIs must be submitted by close of business July 22th, 2024. Questions submitted after this due date may not be considered by the Government for review and answer. All RFIs shall be addressed in-writing (via email) to the Contract Specialist at Robert.Archerusda.gov. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Post-Bid

Water / Sewer

$100,000.00

Public - Federal

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

10

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
73
Active Projects
46
Bidding Soon
545
All Active Projects
253
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better projects. Build better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

August 5, 2024

September 4, 2024

img_map_placeholder

1211 Citation Ct, Santa Maria, CA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.