Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published July 11, 2024 at 8:00 PM
Updated July 12, 2024
Renovation of a municipal facility in Bloomington, Illinois. Completed plans call for the renovation of a municipal facility.
This project includes but is not limited to the following: ? Replacement of 1000 square feet of flooring for the Mclean County Coroner’s Office Morgue, X-Ray room and hallway. ? Cleaning and preparation of existing floor by removing existing epoxy flooring and any existing contaminants. ? Prepare existing concrete to a CSP 2-3 profile for proper application of the new scoped materials. ? Installation of Sherwin/Williams Softop Comfort SL Decorative ¼" Elastomeric Flooring with a Sherwin/Williams Resutile 9685 Protective & Marine Polyurethane resin topcoat. ? Scheduling to minimization downtime for the Coroner’s Office operations. ? Follow all manufacturer's instructions for prep and application of flooring system. ? Daily cleanup of construction debris and materials. ? Implement odor and dust reduction by applying positive air flow to the work area to prevent infiltration to other parts of the facility during removal and application. ? Integral cove base application on all area walls for a seamless finish. ? Removal of base cabinet cove base trim and re-install. Approximately 50 linear feet. ? Work to be performed on weekdays from 7:30am to 4:30pm unless otherwise approved by the Mclean County Project Manager. ? Water will be provided by Mclean County at a wall hydrant point on the exterior. Water hose(s) and connections will be the awarded contractor’s responsibility. ? Polyurethane finish texture and color selections will be shared during the pre-bid conference. ? One year minimum warranty on labor and application. ? The Mclean County Facilities Department will remove all non-stationary equipment and materials from the work area before the flooring contractor begins work and will replace items when the work is complete. ? Base cabinets and morgue workstations will remain in place. Flooring to be applied up to the base cabinet toe kick boards and around the legs of the workstations to prevent removal of stationary items and equipment.
Post-Bid
Municipal
$100,000.00
Public - County
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 10, 2024
August 12, 2024
104 W Front St, Bloomington, IL
Related To This Project
Bloomington, IL
Bid Date: Jul 15 2024
Bloomington, IL
Bid Date: Jul 16 2024
Bloomington, IL
Bid Date: Jul 08 2024
Bloomington, IL
Bid Date: Jul 23 2024
Bloomington, IL
Bid Date: Aug 08 2024
Bloomington, IL
Bid Date: Aug 08 2024
Bloomington, IL
Bid Date: Aug 09 2024
Bloomington, IL
Bid Date: Aug 14 2024
Bloomington, IL
Bid Date: Jun 10 2024
Bloomington, IL
--
Bloomington, IL
Bid Date: May 29 2024
Bloomington, IL
Bid Date: Jun 14 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
