BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 15, 2024 at 8:00 PM

Updated August 16, 2024

Site work, paving and new construction of a mixed-use development in Lewisville, Texas. Working plans call for the construction of a bridge / tunnel; for site work for a bridge / tunnel; sidewalk / parking lot; for paving for a sidewalk / parking lot; and bridge / tunnel.

The owner has determined a prequalified list of design build companies. The City of Lewisville is requesting competitive sealed proposals from qualified contractors to design and install four (4) pedestrian bridges. All questions must be submitted on Bonfire in the questions and answers section. Award will be based on best value as determined by the scoring matrix. All goods and services provided to the City must be compliant with the Americans with Disabilities Act ("ADA") and all regulations promulgated pursuant to the ADA. The successful proposer will be required to certify compliance, if applicable. Question Deadline 06/24/2024 at 2:00 PM CT Deadline to submit Questions Online. Site Walkthrough Appointment Description: Location: Triangular Lake Park - 803 Sir Andred Lane, Lewisville, TX 75056. Any proposals without a signed site inspection affidavit, will be considered non-responsive. Bridge #1 - Triangular Park North, 803 Sir Andred Ln, Lewisville, TX 75056 Bridge #2 - Triangular Park South, 803 Sir Andred Ln, Lewisville, TX 75056 Bridge #3 - Fitness Park, 2617 Round Table Blvd, Lewisville, TX 75056 Bridge #4 - Train Park, 1225 Lady Carol Ln, Lewisville, TX 75056 SCOPE OF WORK 1. Description Design, fabricate, and install pedestrian bridges constructed of fiber reinforced polymer truss bridge spans including bearing devices, anchor bolts, bridge deck, and pedestrian railings. a. Design The Contractor is responsible for the structural adequacy of the pedestrian fiber reinforced polymer truss bridge span design. Submit in your proposal details and design calculations bearing the seal of a licensed Texas Professional Engineer for review and approval by the City or its designees. Include the truss span superstructure, bearing devices, anchor bolts, bridge deck, and bridge railing with accessibility handrails when required. Bridge designs can be arched or flat. Design pedestrian railing in accordance with City and State requirements for pedestrian railing. Railing may be integral with through truss members provided it satisfies LRFD Specification requirements. 2. Fabrication a. Prepare and submit detailed shop drawings for: i. Layout of the complete bridge assembly indicating span lengths, widths, location of bearing assemblies, and top of bearing seat elevations at bridge abutments. ii. Truss span superstructure, bearing devices, anchor bolts and embedment, bridge deck, and bridge railing with accessibility handrails when required

Final Planning

Bridges / Tunnels

$3,000,000.00

Public - City

New Construction, Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

4

Subscribe For Documents

57 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
397
Active Projects
222
Bidding Soon
3,988
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.