BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a civil project in Dalton, Georgia. Completed plans call for site work for a bridge / tunnel; for paving for a bridge / tunnel; and water / sewer project.

Connector 3 Sewer Extension. Construct the CONNECTOR 3 SEWER EXTENSION as described in the provided details Work to Be Done: the Work to Be Done (Hereinafter Referred to as "work") Consists of Furnishing All Materials and Equipment, Except Those Specified in the Bid, and Performing All Labor Necessary for the Following Project (Hereinafter Referred to as "project"): Construct the Connector 3 Sewer Extension as Shown in the Drawings and Specifications. The Georgia Utility Contractor License Number Shall Be Written on the Face of the Bid. Performance and Bid Bond: a Bid Bond Will Be Required in the Amount of 10% of the Total Bid Amount. A Contract Performance Bond and a Payment Bond, in an Amount Equal to One Hundred Percent (100%) of the Contract Price, Will Be Required of the Successful Bidder. Withdrawal of Bids: Except as Provided in O.c.g.a. Section 36-91-43, No Submitted Bid May Be Withdrawn for a Period of Sixty (60) Days After the Scheduled Closing Time for the Receipt of Bids. Allotted: All Work as Specified Herein Shall Be Completed Within 120 Calendar Days of Notice to Proceed. The Bidder Declares That It Understands That the Unit Price Quantities Shown in the Proposal Are Subject to Adjustment by Either Increase or Decrease, by the Owner, and That Should the Quantities of Any of the Items of the Work Be Increased, the Bidder Proposes to Do the Additional Work at the Unit Prices Stated Herein; and Should the Quantities Be Decreased, the Bidder Also Understands That Payment Will Be Made on Actual Quantities at the Unit Price Bid and Will Make No Claim for Anticipated Profits for Any Decrease in the Quantities, and That Quantities Will Be Determined Upon Completion of the Work at Which Time Adjustment Will Be Made to the Contract Amount by Direct Increase or Decrease. The Project Will Consist of a 6" Hdpe Sewer Forcemain Extension From Shaw Industries Plant 69 Along Yeager Dr. 2,850 Ft North Crossing Sr 3 (South Bypass) and Onto Dug Gap Rd. Additionally a 6" Hdpe Sewer Force Main Will Be Running East Along an Easement Off of Sr 3 for Approximately 950 Ft. The Method of Installing Will Be Horizontal Directional Drilled. The Project Will Consists of Installation of Pipe Infrastructure, Valves, Flushing Valves, Installing Future Connections and Boring Casing Pipe Under Sr 3 (S. Bypass), Etc. The Contractor's Work Also Includes All Erosion, Sedimentation, and Pollution Control Necessary for the Project. The Cost of Any Permits Required for Erosion Control and Land Disturbing Will Be Borne by the Owner. The Contractor Will Be Responsible for the Cost of Any Other Permits or Licenses Required to Complete the Work. The Contractor Will Complete All Necessary Clean-up and Restoration Work to Include Filling, Finish Grading, Grassing, Landscaping, Pavement Repairs, Driveway Repairs, Culvert Repairs, Drainage Ditch Restoration and Other Necessary Restoration Activities Such That Post Construction Conditions Are Equal to or Better Than Those Conditions That Existed Prior to Any Construction Activity Occurring. The Owner is Authorized to Issue Change Orders, Without the Necessity of Additional Requests for Bids, Within the Scope of the Project When Appropriate or Necessary in the Performance of the Contract. No Additional Work Shall Be Performed Unless Authorized by the Owner.

Post-Bid

Bridges / Tunnels

$450,000.00

Public - City

Paving, Site Work

6

11

2

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
106
Active Projects
45
Bidding Soon
1,259
All Active Projects
467
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 29, 2024

August 29, 2024

img_map_placeholder

To Be Determined, Dalton, GA

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.