BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 17, 2024 at 8:00 PM

Updated August 21, 2024

Site work for a water / sewer project in Tyndall AFB, Florida. Completed plans call for site work for a water / sewer project.

Additional Information- For the comment "SEE 332 Conservation Measures for Dune Walkover Construction #1 and #3" Civil Enginerring has provided this additional information: Walkovers/Boardwalks. Dune walkovers shall be constructed at a height (minimum three feet above grade - higher if habitat has been impacted from storms) to accommodate natural dune growth and associated vegetation. Amendment 2- The purpose of this amendment is to add the AsBuilt Drawings and the 813. The purpose of the Tyndall Air Force Base (TAFB) project XLWU 25-4009 Extend the Tyndall NCO Beach Boardwalk by 600 feet to reduce negative impacts to the dune and surrounding environment caused by personnel accessing the beaches of Tyndall AFB. New construction will match existing boardwalk design, is to Design and Build to extend existing Boardwalk and its supporting facilities in full compliance with current building codes, including the DoD Building Code, and the portion of the Florida Building Code that contains the High Velocity Hurricane Zone (HVHZ) provisions. The service road is to remain open during the construction of the extension of the boardwalk. Project Location: Tyndall AFB Please see the attachments for further information. The project magnitude for this requirement IAW FAR 36.204(c) between $250,000.00 and $500,000.00. The period of performance is 360 calendars days after Notice to Proceed (NTP). Questions and Answers are due on 23 July 2024 at 1:00 PM, CST. Proposals are due no later than 08 August 2024 at 2:00 PM, CST. Recommend all offerors (via telephone call to appropriate Government POC) confirm receipt of all emailed proposals and revisions. Ensure you acknowledge all amendments in your proposal. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. PID- XLWU 25-4009, XLWU 21-4006 MBE (14.1%), WBE (6.9%), HUB (100%)

Post-Bid

Water / Sewer

$500,000.00

Public - Federal

Site Work

4

8

18

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
63
Active Projects
12
Bidding Soon
396
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 15, 2024

September 16, 2024

Project location map

To Be Determined, Tyndall AFB, FL

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.