Site work for a water / sewer project in Palm Bay, Florida. Completed plans call for site work for a water / sewer project.
Project Estimate $84,245.34 Piggyback Solicitation No Insurance Required Yes Bid Bond Required No All Work for the Project shall be constructed in accordance with the Drawings and Specifications here in. This project consists of the removal, disposal, re-installation, and restoration of street crossing drainage pipes located under Yukon and outfall connection to canal MTWCD C-50 and permits. The project shall include all incidentals required to complete the project such as utility relocation coordination and verification, material furnishings, material shop drawings, catch basin fabrications delivery and installations, dewatering, installations, and restoration work associated with the installation of the pipes and catch basins as identified in the attached design plans. All Maintenance of Traffic (MOT), dewatering, and utility relocation coordination and verification costs required shall be included in the bid as part of the project construction cost. Where detour operations are planned, the contractor shall furnish plans to the City at least two weeks prior to implementation to allow adequate review and approval time. The contractor shall also be responsible for providing MOT (pedestrian and traffic) notification for his work area at a minimum of 72 hours prior to starting any work. The required form will be provided. The contractor shall also provide notification to the homeowners of the work area via door hangers. Pipe installations shall be handled in accordance with manufacturers' specification and recommendations, City of Palm Bay Public Works Manual, and the 2023 Florida Department of Transportation (FDOT) Standard Specifications for Road and Bridge Construction Division II and III documents, links to which have been provided herein. The most stringent requirements shall govern if there are conflicting specification therein. Pipe inverts are to be field verified prior to placement of base material but not sooner than backfill being placed and compacted up to at least one-half the height of the pipe. All field verification shall be done in the presence of a Public Works Engineering Inspector and emailed to the Public Works Project Manager immediately following the field verification. Field verification is for informational purposes only and does not substitute the need for final as-built verification by a professional licensed surveyor. Please refer to the FDOT 2022 spec. Book 430 section 4 for acceptable tolerance and resolution. All pipes noted to have a concrete armor shall be Class IV in addition to the concrete armor. The contractor shall be responsible for any pothole digging to verify utility depths and separation distance to the replacement stormwater pipes. The contractor shall also be responsible for coordination with all utility owners for all relocations and adjustments as may be needed and get utility locates prior to construction and provide those locate tickets and coordination to the City inspector, project manager and utility owners. Project schedule shall be updated monthly and be sent to the Project Manager; These will be discussed as needed at the regularly scheduled meeting. Additional weekly schedule updates shall be discussed and shared with the assigned City Inspectors at the start of each work week for coordination. Question End Date 6/4/2024 5:00 PM
Award
Water / Sewer
$94,086.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 25, 2024
July 18, 2024
Multiple Locations, Palm Bay, FL
Related To This Project
Palm Bay, FL
--
Palm Bay, FL
--
Palm Bay, FL
Bid Date: Jul 23 2024
Palm Bay, FL
Bid Date: Jul 05 2024
Palm Bay, FL
Bid Date: Jul 31 2024
Palm Bay, FL
--
Palm Bay, FL
Bid Date: Oct 16 2020
Palm Bay, FL
Bid Date: Sep 17 2024
Palm Bay, FL
--
Palm Bay, FL
Bid Date: Jul 02 2024
Palm Bay, FL
Bid Date: Jun 25 2024
Palm Bay, FL
Bid Date: Jul 16 2024
Palm Bay, FL
Bid Date: Jul 09 2024
Palm Bay, FL
Bid Date: Aug 08 2024
Palm Bay, FL
Bid Date: Jun 11 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.