Published July 30, 2024 at 8:00 PM

Updated October 1, 2024

Site work, paving and outdoor lighting for a mixed-use development in Fryeburg, Maine. Completed plans call for site work for a transportation facility; for paving for a transportation facility; for outdoor lighting for a transportation facility; and water / sewer project.

Reconstruct Taxiways A, B, & C and Extend Runway 14-32 PHYSICAL LOCATION: Terminal Building Office, Eastern Slope Regional Airport, 210 Lyman Drive, Fryeburg, ME 04037 This project includes two schedules of work: Schedule A is the Reconstruct, Mark, Light and Sign Taxiway 'A' and 'B' (Base Bid) and Reconstruct, Mark, Light and Sign Taxiway 'C' (Additive Alternative #1). This work includes erosion control best management practices, construction safety and phasing, reclamation, unclassified excavation, paving, marking, lighting, signage, drainage, and other ancillary items as required. Schedule B is the Extend Runway 14-32 (75' x 802'). This work includes include erosion control best management practices, construction safety and phasing, clearing and grubbing, clearing, tree removal, base placement, paving, marking, lighting, drainage, and other ancillary items as required. Both schedules also include deduct alternatives that remove the base mounted electrical system and cable in conduit, and replace the items with state mounted electrical system and direct buried cable. If only the Schedule A & Schedule B Base Bid work is awarded, the contract time is 120 calendar days. The contract time for Add Alternate No. 1 (if awarded) is 21 calendar days. For award of the Base Bid and Add Alternate No. 1 the total contract time is 141 calendar days. All bids must be accompanied by a Proposal Surety (cash, certified check, treasurer's or cashier's check, Bid Bond, or other instrument as described in the Instructions to Bidders). QUESTIONS AND CONTACT WITH THE OWNER: From the time of advertising until the actual bid opening for this Contract, all prospective Bidders, Contractors, Subcontractors, and Suppliers shall direct all inquiries related to this project solely to Sydney Seney, PE, McFarland Johnson, 273 Corporate Drive - Suite 200, Portsmouth, New Hampshire 03801, 603-380-9151, sseney@mjinc.com. The deadline for submitting inquiries related to this project is June 26, 2024. A successful Bidder entering into a contract for any portion of the work included in a proposal shall provide the Owner sufficient surety in the form of 100% Performance and Payment Bonds as outlined in the Supplemental General Provisions. The Town of Fryeburg, ME (Eastern Slope Airport Authority) will not discriminate against any bidder on the grounds of race, color, national origin (including limited English proficiency), creed, sex (including sexual orientation and gender identity), age, or disability in consideration for an award. MINIMUM LABOR RATES (DAVIS-BACON WAGE): All work under this project must comply with DavisBacon Act regulations as described in the Contract Documents. Federal Wage Rates are included in the Contract Documents. The right is reserved by the Town of Fryeburg, ME to reject any or all bids, to waive any formality and any and all technicalities in bids and to accept such bids as may be deemed in the best interest of the awarding agency. The Airport has an overall DBE goal of 0.3%.

Bid Results

Transportation Terminals

$1,945,104.00

Public - City

Outdoor Lighting, Paving, Site Work

100

8

44

5

Subscribe For Documents

27 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Administrative Requirements, Submittal Procedures, Certificates, Special Procedures, Alteration Project Procedures, Quality Requirements, Regulatory Requirements, Quality Control, Contractor Quality Control, Temporary Facilities and Controls, Temporary Utilities, Temporary Lighting, Temporary Water, Construction Facilities, Sanitary Facilities, Vehicular Access and Parking, Haul Routes, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Cleaning and Waste Management, Closeout Submittals, Bonds, Warranties, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 03 - Concrete

Division 03 - Concrete

Concrete Reinforcing, Reinforcing Steel, Precast Concrete
Division 04 - Masonry

Division 04 - Masonry

Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry, Sheathing
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Joint Protection, Preformed Joint Seals, Joint Fillers, Joint Sealants
Division 08 - Openings

Division 08 - Openings

Hardware, Glazing, Glass Glazing
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Signage
Division 11 - Equipment

Division 11 - Equipment

Vehicle and Pedestrian Equipment, Parking Control Equipment
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Lifts
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Pumps
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Grounding and Bonding for Electrical Systems, Medium-Voltage Electrical Distribution, Medium-Voltage Transformers, Low-Voltage Electrical Distribution, Low-Voltage Transformers, Lighting, Interior Lighting
Division 27 - Communications

Division 27 - Communications

Communications, Voice Communications
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Site Clearing, Earth Moving, Grading, Excavation and Fill, Excavation, Fill, Backfill, Compaction, Embankments, Erosion and Sedimentation Controls
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Concrete Overlays, Operation and Maintenance of Planting, Fertilizing, Common Work Results for Exterior Improvements, Bases, Ballasts, and Paving, Curbs and Gutters, Paving Specialties, Pavement Markings, Site Improvements, Fences and Gates, Planting, Planting Preparation, Soil Preparation, Mulching, Turf and Grasses, Seeding, Plants, Trees
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities, Storm Drainage Utilities, Culverts, Pipe Culverts
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Cranes and Hoists, Lifting Devices, Lifts, Mobile Plant Equipment, General Vehicles, Maintenance Vehicles
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
58
Active Projects
25
Bidding Soon
521
All Active Projects
234
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 17, 2024

November 1, 2024

img_map_placeholder

210 Lyman Dr, Fryeburg, ME


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Reconstruct Taxiways A, B, & C and Extend Runway

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.