Site work and paving for a mixed-use development in Sugar Land, Texas. Completed plans call for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; and water / sewer project.

**As of August 27, 2024 this project has not yet been awarded. A timeline for award has not yet been established. The Gannoway Lake Trail is a key part of the City of Sugar Land efforts to improve bicycle and pedestrian connectivity and recreational elements. Following Burney Road from the North and South, and following Oyster Creek from the East and West, the proposed shared use paths would provide a critical link between the park and area neighborhoods as well as facilitate a connection to the existing Cullinan Park. At 10 feet wide and fully separated from other vehicular R.O.W.'s, the shared use path will provide pedestrians and cyclists with their best amenity for future trail connections. Refer to Exhibit A-1 for a project map. Gannoway Lake is a key area for closer consideration in the City of Sugar Land 2018 Parks, Recreation, & Open Space Master Plan and a top priority for improvements for residents. The proposed trail also meets the vision of the 2023 Sugar Land Mobility Master Plan as a connection The Gannoway Lake Trail generally includes construction of a 10-foot-wide shared use path along Burney Rd. from Voss Rd. to Oyster Creek then west along Oyster Creek to Cullinan Park with the following improvements: boardwalk along the south edge of Gannoway Lake connection to Imperial Trails pedestrian intersection safety improvements at SH6 widening of the existing pedestrian bridge over Oyster Creek adjacent to SH 6 parking at the trail head adjacent to Burney Rd loop trails near Gannoway Lake Additional duties include but are not limited to surveying, geotechnical engineering services, design and review compliant with TDLR and ADA requirements, coordination of utilities location and relocation (as required), traffic signal modifications, completion of an environmental assessment in accordance with TxDOT and FHWA requirements and environmental clearance for the entire length of the project limits, and bidding and construction phase services. At least one of the Firm's team members working on each phase of the Project daily shall have mandatory TxDOT Local Government Project Procedures (LGPP) certification.

Post-Bid

Sidewalks / Parking Lot

$800,000.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
102
Active Projects
58
Bidding Soon
2,719
All Active Projects
1,109
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 5, 2024

August 5, 2024

img_map_placeholder

Multiple Locations, Sugar Land, TX

The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.