Published July 27, 2024 at 8:00 PM

Updated July 28, 2024

Site work and paving for a road / highway in Miami Beach, Florida. Completed plans call for site work for a road / highway; and for paving for a road / highway.

The City's consultant, Kimley-Horn and Associates, has completed the construction documents for the 23rd Street Complete Streets Improvements Project. The plan incorporates bicycle lanes on 23rd Street between Dade Boulevard and Park Avenue, on Park Avenue between 23 and 22 Streets, and on 22nd Street from Park Avenue to the Beachwalk. The Project has been reviewed by several regulatory agencies, and permit pre-approvals have been obtained. The construction project includes buffered bike lanes, two-way bicycle lanes, reduced travel lane widths, parking modifications, new traffic signal mast arm and appurtenances, pedestrian signals, sidewalk curb and gutter replacement, driveway modification, installation of fiber optic conduit and pull boxes along Park Avenue and 22nd Street, raised (tabletop) intersection at 22nd Street and Park Avenue, intersection bulb-outs, drainage improvements, pavement milling and resurfacing, signage and pavement marking throughout the project limits. The contractor must obtain all permits necessary to perform the work, obtain FDOT approval of their Traffic Control Plan and coordinate all FDOT regulatory requirements within their Right-of-Way with the City's Consultant(s) as necessary during the performance of the work. The project site is adjacent to a prominent Cultural Campus and public buildings comprised of the Miami City Ballet, Miami Beach Library, the Collins Park Garage and the Bass Museum of Art. Therefore, the contractor must maintain access to driveways and will be responsible for coordinating notification to the stakeholders as necessary. Q & A deadline: Jul 01, 2024 5:00:00 PM EDT Questions will be allowed up to 10 days before the initial deadline for submittal of Bids. Questions must be directed to nataliadelgado@miamibeachfl.gov, with a copy to the City Clerk rafaelgranado@miamibeachfl.gov. Project Site(s): 23rd Street between Dade Boulevard and Liberty Avenue Park Avenue between 23 and 22 Streets 22nd Street from west of Park Avenue to the Beachwalk Estimated Budget: $2,483,000 Licensing Requirements. Bidder shall be State of Florida Certified General Contractor OR Underground Utility and Excavation Contractor OR Miami-Dade County Licensed General Contractor to be considered for award. Submittal Requirement: Provide a copy of the license. Contract Time & Schedule: Days for Substantial Completion: 274 days Days for Final Completion: 30 days Total Project Duration: 304 days

Post-Bid

Roads / Highways

$2,483,000.00

Public - City

Paving, Site Work

93

10

13

6

Subscribe For Documents

87 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
254
Active Projects
96
Bidding Soon
1,741
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 26, 2024

September 26, 2024

Project location map

23rd St, Miami Beach, FL

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.