Published June 21, 2024 at 8:00 PM

Updated June 22, 2024

Site work for a water / sewer project in Carrollton, Alabama. Completed plans call for site work for a water / sewer project.

The Project consists of demolition, excavation, drainage structure installation, erosion control, and cement flume construction. Bids will be received for a a single prime contract. Bids shall be on a lump sum and unit price basis, as indicated in the Bid Form. Bids shall be accompanied by a bid security in accordance with the Instructions to Bidders. The successful Bidder must furnish Performance and Payment Bonds in accordance with the Contract Documents. All Bidders shall make good faith efforts, as defined by Appendix A of 49 CFR Part 26, Regulations of the Office of the Secretary of Transportation, to subcontract a minimum of 6.37% of the dollar value of the prime contract to small business concerns owned and controlled by socially and economically disadvantaged individuals (DBE). Goals for minority participation for each trade: 20.7% Goals for female participation in each trade: 6.9% The PICKENS COUNTY COMMISSION reserves the right to reject any or all Bids, to waive irregularities in the Bids and bidding deemed to be in the best interests of the PICKENS COUNTY COMMISSION, and to reject nonconforming, nonresponsive, or conditional bids. Bid Bond required at five percent (5%) of the Total Bid amount. DBE Goal is 6.37%. Liquidated Damages are $500.00 per calendar day of delay. This item shall consist of modification of existing drainage structures, and the removal and satisfactory disposal of utility poles; trees, stumps, roots, buried logs, brush, grass, and other unsatisfactory materials; roadway pavements; water and sewer lines; signs, sign supports, sign foundations; curb and curb and gutter; driveways; guardrail; retaining walls; manholes; drainage structures (including reinforced concrete channels, headwalls, and wingwalls); concrete or masonry foundations (including foundations of poles or signs to be removed) or slabs; and concrete ducts and pipe culverts, all of which are not designated or permitted to remain. While an attempt has been made to outline all structures included in the plans, all structures required to be removed may not be designated as such in the plans. The Contractor shall make his own estimate of the work required for the removal of structures which conflict with the proposed construction.

Post-Bid

Water / Sewer

$920,000.00

Public - County

Site Work

36

9

5

3

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
91
Active Projects
57
Bidding Soon
615
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 20, 2024

July 22, 2024

Project location map

Multiple Locations, Carrollton, AL

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed