BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a civil project in Denver, Colorado. Completed plans call for site work for a road / highway; for paving for a road / highway; and water / sewer project.

Thunder Wiin Act Project A bid bond is required for all sealed bids over $50,000.00. A bid guarantee in an amount not less than five percent (5%) of the total bid price must be submitted in the form of a firm commitment, such as a bid bond, bank money order, certified check, or cashier's check. Checks or money orders should be made payable to the Treasurer, State of Colorado. If a bid bond is submitted, the State form shall be used. Bidders submitting a bank money order, certified check, or cashier's check must submit a scanned copy via the online website and mail the physical check to the purchasing agent when requested. This Bid is accompanied by the required Bid Guaranty. You are authorized to hold said Bid Guaranty for a period of not more than thirty (30) days after the opening of the Bids for the work above indicated, unless the undersigned bidder is awarded the Contract, within said period, in which event the Director, Division of Reclamation, Mining and Safety may retain said Bid Guaranty, until the undersigned bidder has executed the required Agreement and furnished the required Performance Bond, Labor and Material Payment Bond, Insurance Policy, Certificates of Insurance and any other documents required by the Special Conditions. TIME OF COMPLETION: The bidder agrees to complete the entire project within 47 calendar days from the Notice to Proceed, subject to Article 33 TIME OF COMPLETION and Article 39 LIQUIDATED DAMAGES, of The General Conditions of the Contract. If awarded this work, the bidder agrees to begin work within ten (10) days from the date of the Notice to proceed and agrees to prosecute the work with due diligence to completion. The right is reserved to waive informalities and to reject any Bid Waste rock at the Thunder Mine was deposited in the bottom of an ephemeral, unnamed channel. Mine drainage and surface runoff from snowmelt and rain events comes in direct contact with the Thunder Mine waste rock, providing a transport mechanism for contamination over land and into the East Fork of the Mancos River. The scope of work is to remove waste rock from the ephemeral channel to reduce mobilization of metals and provide a stable conduit for natural runoff that does not contact waste rock. Waste rock will be relocated to an area west (on-site) of the current waste rock pile and ephemeral drainage path. Waste rock will be excavated to a clean-up goal to be set by the USFS and DRMS, considering the high copper, arsenic, lead, mercury and zinc as clean-up targets. Currently, the only clean-up target is for lead, set at 2,000 ppm, which is in keeping with clean-up levels in the Animas River basin set by the Environmental Protection Agency for recreational areas on the superfund site. Additional metals clean-up levels may be set in the field during project execution, depending on metals levels encountered below the waste rock pile in the native soils. Sampling during excavation will be done with an x-ray fluorescence meter to determine the levels in the soils for clean-up. The relocated and consolidated mine waste will be covered with clean cover talus as well as talus and scree harvested from on-site to reduce erosion.

Post-Bid

Roads / Highways

$495,000.00

Public - State/Provincial

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
94
Active Projects
38
Bidding Soon
998
All Active Projects
419
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 24, 2024

August 23, 2024

img_map_placeholder

Multiple Locations, Denver, CO

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.