Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published August 3, 2024 at 8:00 PM
Updated August 4, 2024
Site work for a road / highway in Northville, Michigan. Completed plans call for site work for a road / highway.
Installation of countdown pedestrian signals on various routes in the city of Northville, Oakland and Wayne Counties. This is a Local Agency Project. Net classification required for this project is 95 L Control Sec Job No Federal No VRU 82000 218022A 24A0588 MI DOT - 2407 009 - Installation of Countdown Pedestrian Signals on Various Routes SCOPE OF WORK: The construction, installation, treating and reconditioning of pipelines transporting gas vapors within cities, towns, subdivisions, suburban areas, or within private property boundaries, up to and including private Questions regarding the permit process are to be directed to Bassma Gawil at (734) 858-2756. meter settings of private industrial, governmental or other premises, more commonly referred to as distribution work, starting from the first metering station, connection, similar or related facility, of the main or cross country pipeline and including duct installation. Question Deadline 07/05/2024 All inquiries must be made by E-mail through the electronic proposal system at MILogin for Third Party's MDOT e-Proposal application. Telephone inquiries will not be answered. To be able to process and distribute an addendum, if required, all inquiries shall be made at least seven (7) calendar days before the letting.
Award
Roads / Highways
$77,531.00
Public - State/Provincial
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 12, 2024
August 12, 2024
Multiple Locations, Northville, MI
Related To This Project
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
