Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published June 11, 2024 at 8:00 PM

Updated June 12, 2024

Demolition and site work for a bridge / tunnel in Northville, Michigan. Completed plans call for site work for a bridge / tunnel; and for the demolition of a bridge / tunnel.

Reference Number 0000350236 Furnishing of all labor, equipment and materials necessary to daylight approximately 800 LF of the Rouge River, including demolition of the existing enclosed channel, earthwork, bridge and bridge abutment construction, site restoration and related items of work. General Requirements - Bid Deposit Required - Contractors License Required - Installation Required - Insurance Required. Bonding Requirements - Bid Bond 5 % - Performance Bond 100 % - Maintenance Bond 50 % - Labor and Materials Bond 100 %. Question Deadline 05/16/2024 at 12:00 AM ET Questions regarding this Proposal can be directed to the Owner's Representative on the Project Andrew Milia, Franklin Property Corporation, 248-539-3332, amilia@franklinpropertycorp.com, or Wendy Wilmers Longpre, City of Northville, 248-305-2710, wlongpre@ci.northville.mi.us. The City of Northville reserves the right to accept any bid, reject any or all bids, to waive informalities and make the award in any manner deemed in the best interest of the City of Northville.

Bid Results

Bridges / Tunnels

$8,884,160.00

Public - City

Demolition, Site Work

36

17

8

2

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
389
Active Projects
170
Bidding Soon
2,679
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 23, 2024

June 24, 2024

Project location map

301 S Center St, Northville, MI

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed