BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a civil project in Livermore, California. Completed plans call for site work for a water / sewer project; road / highway; and for paving for a road / highway.

Reference Number 0000354881 The Engineer's estimated construction cost is: $775,000. The project is located at three different sites in Livermore as shown on Sheet C1 of the bid plans. The work includes sediment removal, debris removal, bank stabilization, vegetation management, and access road repair. General Requirements - Certified Payroll - Contractors License Required - Federally Funded - Insurance Required - Prevailing Wage Required Bonding Requirements - Bid Bond 10 % - Performance Bond 100 % - Surety Bond 15 % - Payment Bond 100 % --Performance, Payment, and Warranty Bonds. The successful bidder will be required to provide performance and payment bonds each in the amount of 100% of the Contract Price and a Warranty Bond in the amount of 15% of the Contract Price. Each Bid Proposal must be accompanied by bid security of ten percent of the maximum bid amount, in the form of a cashier's or certified check made payable to City, or a bid bond executed by a surety licensed to do business in the State of California on the Bid Bond form included in the Contract Documents. Question Deadline 07/02/2024 at 2:30 PM PT Questions are submitted online No . Bid Clarifications. Questions regarding the Project, the bid procedures, or the meaning or intent of the Contract Documents must be submitted in writing to the Engineer at: Leo Sum, Assistant Civil Engineer Community Development Department, Engineering Division City of Livermore 1052 S. Livermore Ave Livermore, CA 94550 Email: lysum@livermoreca.gov Pamela Lung, Special Projects Coordinator Community Development Department, Engineering Division City of Livermore 1052 S. Livermore Ave Livermore, CA 94550 Email: pglung@livermoreca.gov Time for Completion. The planned timeframe for Substantial Completion of construction of the Project is 30 Working Days after the commencement date stated in the Notice to Proceed. Final Completion of the Project is planned to be 10 Working Days after the date of Substantial Completion. It is critically important to this Project that all work within the creek areas are completed prior to October 15, 2024. At the time of bid opening and for the duration of the Project, shall possess a valid California contractor's license for the following classification(s): Class A (General Engineering). See also, Instructions for Bidders, Section 4, Licenses and DIR Registration. A bid submitted by a bidder that does not possess any of these licenses at bid opening may render the bid non-responsive, barring award of the Contract to that bidder. 13. Disadvantaged Business Enterprises Projects financed in whole or in part by Federal funds are subject to Title 49 of the Code of Federal Regulations, Part 26, "Participation by Disadvantaged Business Enterprises in Department of Transportation Financial Assistance Programs." Certified Disadvantaged Business Enterprises, Minority Owned Business Enterprises, and Women Owned Business Enterprises are strongly encouraged to apply. *City reserves the right to reject any and all bids and to waive any non-substantive irregularities. The Project is located at three various locations per the 2024 Stream Maintenance Program including Airway Blvd, near the 580 interchange, Arroyo Mocho Trail near Anza Way, and Arroyo Mocho Trail near Creek Road, and is described as follows: sediment and debris removal at Airway Blvd, culvert at Arroyo Las Positas (LOP 5), restore exposed storm drain at Arroyo Mocho Trail at Anza Way (LOP 13), and bank stabilization at Arroyo Mocho Trail at Creek Drive (LOP 14).

Award

Water / Sewer

$446,713.00

Public - City

Paving, Site Work

13

19

17

6

Subscribe For Documents

34 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
144
Active Projects
55
Bidding Soon
1,899
All Active Projects
810
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 9, 2024

August 8, 2024

img_map_placeholder

Multiple Locations, Livermore, CA

Try it free. The data you need to build the relationships you want.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.