BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work for a civil project in Livermore, California. Completed plans call for site work for a road / highway; and water / sewer project.

The Work consists of: repairing and grading eroded banks, installing rock slope protection including geogrid, installing willow stakes, and planting. Work shall be performed at one site along Line G-1-1 (Site 913) and two sites along Line B (Sites 914 and 915) in Pleasanton, California as shown on the drawings. Site 913 is an approximately 120-foot long segment of eroded right bank of Line G-1-1, adjacent to a DSRSD wastewater treatment plant. Sites 914 and 915 are eroded banks that span approximately 155 and 140 feet, respectively, of Arroyo De Laguna. A staging area is available at each site, as shown on the plans. The successful Bidder must comply with all prevailing wage laws applicable to the Project, and related requirements contained in the Contract Documents. Pursuant to applicable provisions of the Labor Code, the District has implemented and shall enforce a Labor Compliance Program (LCP) for the Work. The successful Bidder shall be required to comply with all the requirements of the District's LCP and applicable provisions of the California Labor Code. In bidding on the Work, it shall be each Bidder's responsibility to evaluate the cost of complying with the District's LCP. Bidders shall include all costs of compliance with specified requirements in their bids. A Notice to Proceed with Work is subject to receipt of all regulatory permits. Therefore, all heavy equipment in-channel work and implementation of erosion control may be performed during the two construction seasons of May 1, 2024 - October 31, 2024 and May 1, 2025 - October 31, 2025, or as directed by the Project Engineer. Work may not commence at any site unless all work can be completed within the same construction season. Final Completion of this Project shall be completed by December 16, 2025 District specifically reserves the right, in its sole discretion, to reject any or all Bids, or re-bid, or to waive inconsequential deviations from Bid requirements not involving time, price, or quality of the Work. Question Deadline 07/12/2024 at 3:00 PM PT CONTACT INFORMATION. Mailing/delivery address for bidding documents: Zone 7 Water Agency 100 North Canyons Parkway Livermore, CA 94551 Project Engineer: Adolfo Perez 925-454-5010 aperez@zone7water.com

Post-Bid

Water / Sewer

$1,227,000.00

Public - County

Site Work

37

28

17

10

Subscribe For Documents

30 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
176
Active Projects
91
Bidding Soon
1,933
All Active Projects
810
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 23, 2024

May 1, 2025

img_map_placeholder

Multiple Locations, Livermore, CA


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.