Renovation of a fire / police facility in Washington, District of Columbia. Completed plans call for the renovation of a fire / police facility.

The District of Columbia (the "District") Department of General Services ("DGS" or "Department") is issuing this Invitation for Bids ("IFB") to engage a licensed Commercial Roofing Contractor ("Contractor") to provide all labor, material, equipment, site supervision, inspection for the demolition of existing roofing system and removal from site, and the installation of new roofing system (the "Project"). The Project site is at the DC Fire & Emergency Medical Services ("FEMS") Engine Company 29 ("EC29"), located at 4811 MacArthur Blvd NW, Washington, DC, 20007. The Project consists of the demolition of existing roofing and installation of a new roofing system, as outlined in Attachment J.1 (Drawings & Specifications). This SOW does not provide comprehensive documentation of all the items required to complete the work. It is the responsibility of the Contractor to ensure a turnkey solution is delivered. 1. All work shall be in full compliance with the requirements of all applicable codes, the codes and regulation of the District of Columbia and all other agency having jurisdiction over the work of this Contract. 2. Provide all engineering, layout and coordination as required for the complete and proper installation of the new roofing systems. 3. Obtain all Department of Buildings ("DOB") permits and inspections for the work. Offer guidance and clarification to project stakeholders regarding DOB regulations and compliance requirements. 4. Maintain regular communication with the Project team including contractors, architects, engineers, and owner's representatives. 5. Attend job meetings and construction coordination meetings as required or requested. 6. The Contractor is responsible for obtaining any roofing system literature (i.e., manuals, product data, cut-sheets and warranties, etc.) for the roofing system installed. 7. The Contractor shall utilize ProjectTeam for all Project correspondence and communication, including but not limited to the submission of Project submittals, request for information, monthly progress billing, field observation, inspection reports, closeout document, etc. 8. In addition to the submission of electronic Project closeout documents, provide to the DGS Project Manager, at the completion of the Project, a non-electronic closeout document in an organized/bounded format (i.e., notebook, folder, flash drive, etc.). 9. Provide operation and preventative maintenance training on the installed new roofing system upon the completion of the work. 10. Provide final cleaning of all contractor-installed systems/workspaces and dispose all debris resulting from the work If a prospective bidder has any questions relative to this solicitation, the prospective Bidder shall submit the questions in writing. The prospective Bidder shall submit questions no later than 4:00 p.m., EST on July 8, 2024, through online Bond Notes: Bidders are required to submit with their bid a bid bond in the amount of five percent (5%) of total bidding budget, in the form included as Attachment J.10. All bonding companies must be included on the Department of Treasury's Listing of Approved Sureties. Alternatively, Bidders may submit a cashier's check in lieu of a bid bond. However, in the event a Bidder who is awarded the Agreement fails to post a payment and performance bond for the full value of the Agreement, the Bidder shall there by forfeit the full amount of the cashier's check, and the Department shall collect such funds as liquidated damages. If the Bidder chooses to submit a cashier's check in lieu of a bid bond, the Bidder must complete the form included as Attachment J.11 and return, notarized, with the Bidder's Proposal. The Contractor shall be required to provide payment and performance bonds each having a penal value equal to 100% of the Contract Amount. The Contractor shall provide the required bonds within ten (10) days of the execution of the Contract. All bonding companies must be licensed to conduct business in the District of Columbia and be included on the Department of Treasury's Listing of Approved Sureties website. The Contractor shall submit with its bid a certification to provide payment and performance bonds (Attachment J.13

Bid Results

Fire / Police

$364,317.00

Public - State/Provincial

Renovation

23

7

39

3

Subscribe For Documents

14 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
154
Active Projects
75
Bidding Soon
1,997
All Active Projects
865
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 14, 2024

September 10, 2024

img_map_placeholder

4811 MacArthur Blvd NW, Washington, DC

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.