BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 27, 2024 at 8:00 PM

Updated June 28, 2024

Site work, paving and new construction of a mixed-use development in Crystal Lake, Illinois. Completed plans call for site work for a road / highway; for paving for a road / highway; for the construction of a warehouse / distribution facility; and warehouse / distribution facility.

This work shall consist of sawcutting and removing any existing pavement, trenching / excavating for installation of proposed conduit, installation of the new PVC conduit, and backfilling the trench. This work shall follow the requirements of section 810 of the Illinois Standard Specifications for Road and Bridge Construction (latest). June 20, 2024 5:00 p.m. Questions Submitted by Public Works Cold Storage Building. Description: PUBLIC WORKS COLD STORAGE BUILDING - Build a new pole barn structure along with new drive access and gate.

Post-Bid

Roads / Highways

$70,000.00

Public - City

New Construction, Paving, Site Work

8

8

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
543
Active Projects
296
Bidding Soon
3,894
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 25, 2024

July 25, 2024

Project location map

410 S Main St, Crystal Lake, IL

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.