BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work, paving and outdoor lighting for a mixed-use development in Flora, Illinois. Completed plans call for site work for a transportation facility; for outdoor lighting for a transportation facility; for paving for a transportation facility; and water / sewer project.

As of August 19, 2024, this project has not yet been awarded. A timeline for award has not yet been established. This Project Consists of the Removal and Replacement of a Reinforced Concrete Drainage Pipe That Runs Underneath Runway 3/21 Along With the Associated Work Including Pavement Removal and Patching, Runway Light and Sign Removal and Cable Splicing, Grading and Earthwork as Described in the Contract Documents. Project Location: Flora Municipal Airport, I Airport Road, Flora. Il 62839 Time of Completion and Liquidated Damages A. Successful Bidder Shall Begin the Work on Receipt of the Notice to Proceed and Shall Complete the Work Within the Contract Time. Work is Subject to Liquidated Damages. Contract Time Will Be Twenty-one (21) Calendar Days. All Materials Shall Be on Site Before Any Removal Work Will Be Permitted to Proceed. Liquidated Damages Will Be in the Amount of $500 Per Day for Every Day That the Project is Not Complete Past the Date Agreed Upon in Project Schedule. Bidders Must Be Properly Licensed Under the Laws Governing Their Respective Trades and Be Able to Obtain Insurance and Bonds Required for the Work. Prequalification With the State of Illinois Capital Development Board (Cdb), With Support From a Vendor With More Than 5-years of Experience Successfully Producing Comparable Equipment, is Sufficient Prequalification. If Not Prequalified, Prequalification Will Be Required in Accordance With 002113 Instructions to Bidders. A Performance Bond, Separate Labor and Material Payment Bond, and Insurance in a Form Acceptable to Owner Will Be Required of the Successful Bidder.

Award

Water / Sewer

$393,622.00

Public - City

Outdoor Lighting, Paving, Site Work

17

8

2

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
41
Active Projects
34
Bidding Soon
356
All Active Projects
153
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 8, 2024

August 7, 2024

img_map_placeholder

1 Airport Rd, Flora, IL

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.