BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Make some green this Black Friday.

Subscribe for the Commercial Construction data you need to get and stay ahead of the competition.

Renovation of a detention facility in Kirksville, Missouri. Working plans call for the renovation of a detention facility.

**As of September 27, 2024, no bids received for this project. As of this time it is unknown if and when project will rebid. Flooring-the flooring is currently tiled with some missing and/or damaged, so it will need to be removed and prepared for the new flooring. A commercial textured non-slip epoxy coating such as Permacoat 4000 or Everlast Epoxy will be applied. Showers -The walls of the showers will be stripped to remove any mold or rust. An epoxy coating such as Permacoat 4000 or Everlast Epoxy will be applied to the walls and floors. The floors need to be textured for slip resistant. New vinyl cove base will be installed at the base of the shower walls to prevent moisture accumulation. There are five (5) showers: Intake, Work Release, A Pod, B Pod, C Pod. As of July 10,2024, no bids were received, no definite date for the rebid. The Adair County Sheriff's Office is accepting bids for the upgrade of floors, walls, showers, and replacement of glass panels in the Adair County Detention Center. Any inquiries concerning the proposal should be directed to Sergeant Chris Stivers, Jail Administrator at 660-665-4644 or cstivers@adaircosomo.gov.

Final Planning

Jails / Prisons

$200,000.00

Public - County

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
38
Active Projects
24
Bidding Soon
224
All Active Projects
107
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 19, 2024

March 27, 2025

img_map_placeholder

To Be Determined, Kirksville, MO

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.