BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Make some green this Black Friday.

Subscribe for the Commercial Construction data you need to get and stay ahead of the competition.

Site work for a bridge / tunnel in Kirksville, Missouri. Completed plans call for site work for a bridge / tunnel.

The Project consists of the collection and transportation of existing bridge materials provided by Adair County, fabrication and painting of a single span steel bridge superstructure, and delivery of the finished superstructure to the project location Bid security shall be furnished in accordance with the Instructions to Bidders ***Document Note Checks for Bidding Documents shall be payable to Howe Company LLC. Upon request and receipt of the document fee indicated above plus a non=refundable shipping charge, the Issuing Office will transmit the Bidding Documents via delivery service. The date that the Bidding Documents are transmitted by the Issuing Office will be considered the Bidder's date of receipt of the Bidding Documents. Partial sets of Bidding Documents will not be available from the Issuing Office. Bid Documents can also be obtained in PDF form Online Transportation of 6 - W16x45 steel beams, 40' long, from the Adair County Highway Department yard near Kirksville, Missouri to your fabrication shop. Adair County will provide staff and equipment to lift and set the W16x45 girders on a semi-trailer. The fabricator is responsible for securing and transporting the load. Cut the girders to length as shown in the attached plans. Furnish, fabricate, install on the W16x45; Web stiffener plates and diaphragm connector plates Shear studs Decking support angles Furnish and fabricate bent plate or equivalent channel diaphragms. Hot-dip-galvanizing of superstructure, OR, one coat of zinc-rich primer followed by one coat of compatible top coat. Furnish and deliver galvanized bolts, washers, and nuts for structural steel assembly. Furnish and deliver neoprene bearing pads. Furnish and deliver - cut to length pieces - approximately 70 S.Y. of 1 1/2" metal decking to set between the bridge girders on the angles welded to the sides of the girders. The component sizes, location, and installation requirements are shown on the attached plans prepared by Howe Company, LLC for the Missouri Trail bridge (No. 2280005) project. Temporary storage of the bridge package until delivered to the bridge site.

Award

Bridges / Tunnels

$48,543.00

Public - County

Site Work

22

6

2

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
38
Active Projects
24
Bidding Soon
224
All Active Projects
107
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 10, 2024

September 9, 2024

img_map_placeholder

To Be Determined, Kirksville, MO


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.