Renovation of an educational facility in Sacramento, California. Completed plans call for the renovation of a educational facility.

Bid Security in the amount of 10% of the Lump Sum Base Bid, excluding alternates, shall accompany each Bid. The Surety issuing the Bid Bond shall be, on the Bid Deadline, an admitted surety insurer (as defined in California Code of Civil Procedure Section 995.120). The successful Bidder will be required to have the following California current and active contractor's license at the time of submission of the Bid: B - General Contractor. This project consists of radiological equipment replacement in three X-ray rooms at the UCDH SESP Building. Existing X-ray equipment will be replaced with similar new equipment utilizing the existing structural support system. Existing cabinets with a hand-wash sink in each room does not meet accessibility requirements and will be removed and replaced with new, accessible cabinetry and hand-wash sinks. Per the medical physicist report, the existing lead shielding is sufficient for the new equipment. Areas of shielding disturbed during construction shall be replaced with shielding to match existing. The control area modular shielding in room 1P754 will be remove and replaced in a new configuration to provide better shielding of the existing wall opening facing the staff areas of the radiology department. Minor cosmetic changes such as painting and installing new wall protection are also included in the scope of this project. No proposed changes to the existing rated walls or smoke compartments are included. All existing smoke detectors, fire alarms, and fire sprinklers are existing to remain. The X-ray room construction will be phased, each room will be completed sequentially such that two rooms are always operational. Room 1P758 shall be completed first, follow by room 1P754, then by Room 1P752. Phasing of construction shall be coordinated and confirmed with the UCDH Radiology department at the time of construction. Imaging equipment within scope needed for diagnostic services of emergency/trauma patients are exempted per 2022 CBC Section 14.3.1 Item 7 special seismic certification (OSP) requirement based on overall functional plan This project consists of radiological equipment replacement in three X-ray rooms at the UCDH SESP Building. Existing X-ray equipment will be replaced with similar new equipment utilizing the existing structural support system. Existing cabinets with a hand-wash sink in each room does not meet accessibility requirements and will be removed and replaced with new, accessible cabinetry and hand-wash sinks. Per the medical physicist report, the existing lead shielding is sufficient for the new equipment. Areas of shielding disturbed during construction shall be replaced with shielding to match existing. The control area modular shielding in room 1P754 will be remove and replaced in a new configuration to provide better shielding of the existing wall opening facing the staff areas of the radiology department. Minor cosmetic changes such as painting and installing new wall protection are also included in the scope of this project. No proposed changes to the existing rated walls or smoke compartments are included. All existing smoke detectors, fire alarms, and fire sprinklers are existing to remain. The X-ray room construction will be phased, each room will be completed sequentially such that two rooms are always operational. Room 1P758 shall be completed first, follow by room 1P754, then by Room 1P752. Phasing of construction shall be coordinated and confirmed with the UCDH Radiology department at the time of construction. Imaging equipment within scope needed for diagnostic services of emergency/trauma patients are exempted per 2022 CBC Section 14.3.1 Item 7 special seismic certification (OSP) requirement based on overall functional plan In addition, the University is committed to promoting and increasing participation of small business enterprises (SBEs) and disabled veteran business enterprises (DVBEs) relating to all goods and services covered under the awarded agreement, subject to any and all applicable obligations under state and federal law, and University policies. The awarded contractor shall make best efforts to provide qualified SBEs and DVBEs with the maximum opportunity to participate. Please contact hs-contracts@ucdavis.edu for further information. S231373-34-00-ACD-001

Award

Educational

$920,572.00

Public - City

Renovation

45

16

21

4

Subscribe For Documents

30 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
142
Active Projects
82
Bidding Soon
1,541
All Active Projects
639
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 24, 2024

August 27, 2024

img_map_placeholder

2315 Stockton Blvd, Sacramento, CA

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.