BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 25, 2024 at 8:00 PM

Updated September 26, 2024

Site work and paving for a road / highway in White Lake, Wisconsin. Completed plans call for site work for a road / highway; and for paving for a road / highway.

As of September 25, 2024. Project was awarded to Langlade County but no awarded amount available. Project consist of wedging and hot-mix asphalt HMA paving of 2" average compacted thickness on existing streets as follows: Marathon Drive from Intersection at Lakeside Street going west Approx. 970' 20 feet wide-wider at intersection Mill all butt joints Mytas Road From intersection at Church Street going south approximately 1400' 20 feet wide-wider at intersection Mill all butt joints Contact Scott for more information at 715-882-3411

Award

Roads / Highways

$400,000.00

Public - City

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
81
Active Projects
24
Bidding Soon
431
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 31, 2024

September 2, 2024

Project location map

Multiple Locations, White Lake, WI


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.